Bump actions/checkout from 6 to 7 in the all-dependencies group (#791) #511
tests.yaml
on: push
Matrix: test
Run Django LTS test suite
0s
Annotations
9 errors
|
test (3.11, 1)
Process completed with exit code 1.
|
|
test (3.14t)
The strategy configuration was canceled because "test._3_11_1" failed
|
|
test (3.14t)
The operation was canceled.
|
|
test (3.14)
The strategy configuration was canceled because "test._3_11_1" failed
|
|
test (3.14)
The operation was canceled.
|
|
test (3.10)
The strategy configuration was canceled because "test._3_11_1" failed
|
|
test (3.10)
The operation was canceled.
|
|
test (3.12)
The strategy configuration was canceled because "test._3_11_1" failed
|
|
test (3.12)
The operation was canceled.
|