Loom — harness base spec (draft)

Purpose

Loom is a separate runtime for mechanically enforcing the idea-to-production framework. The framework owns what skills do and how they compose; Loom owns execution state and enforceable safety boundaries. This draft records design decisions and required behavior, not implemented production guarantees.

Delivery sequencing, staffing assumptions, release scope and evidence gates are in ROADMAP.md. Its first production release precedes the planned second-runtime continuation; milestone 4 is not complete until both are qualified. The roadmap does not waive this spec's safety boundaries or authorize a build.

Development procedure: AGENTS.md. Critical rationale: decisions.md. Before application or test code for a new phase, feature or refactor, update the active phase specification with all seven sections below. SPEC.md is the canonical repository spelling; do not create a separate case-only spec.md file.

Source of truth and readiness

  • Framework baseline for this draft: /home/zeref/Dev/I2P at commit 4fe0869ae41b0d81cbe3c6bc643f10ff2049ceed, version 2.1.0 (re-pinned from 1d66588 at gate closure; the delta is evidence-only — README status, FAIL-07 result line, five result files — no contract, registry, or lockfile changes). Refer to SKILL-FRAMEWORK.md §§25, 27 and CUSTOM-HARNESS.md there.
  • The framework's dependency.md is the authoritative skill registry; dependency.json is its generated machine-readable form, and skills.lock.json pins upstream content. Adapter contracts live in each itp-*/SKILL.md. Result and run-ledger shapes are documented in .agents/skills/idea-to-production/references/artifacts.md.
  • The §25 readiness gate is MET (closed 2026-10-01; all four conditions met by run, none waived: standard golden repeat, greenfield golden repeat, full grilling interview, FAIL-07 negative + positive paths). Judgment: tests/skills/results/2026-10-01-readiness-gate-closed.md; evidence: 2026-10-01-golden-repeat.md, -greenfield-repeat.md, -grilling.md, -fail07.md in the framework repo. Enforcement code is permitted as of this closure.
  • Loom consumes a specific framework revision; it does not edit, reimplement, install, or silently substitute framework skills.

Runtime architecture and security boundary (2026-10-20 decision)

Build Loom over upstream Pi, not a fork. Use Pi's SDK and extensions for agent execution; keep Loom's authoritative state, policy and verification outside the Pi execution environment. Pi owns conversations and sessions; Loom owns task/workflow state, grants, leases, audit and completion. Hooks provide early rejection, feedback and telemetry, not the sole safety boundary. Reconsider a fork only for a demonstrated missing contract that cannot be satisfied by owned operations, disabling a channel or an upstream change; more hooks would not sandbox malicious same-process code.

The release-specific API review and execution audit verified Pi 1.3.0 at 71023aec1546d6d677a65669c5665c0927ce0dd0. Ordinary model/nested/ registered MCP tools share a gateway, but SDK Bash, extension execution, startup and model-call paths do not all traverse it. Input can change after validation; redaction and settlement exceptions can fail open; cancellation can leave descendants or delayed effects running. Offline component probes are evidence of those limits, not end-to-end Loom safety proof. The old 0.99.2 research baseline is unchanged; runtime promotion remains separate.

Required boundaries:

  1. Isolated execution. Run the entire Pi process, executable extensions and descendants inside a restricted OS/container/VM execution domain, including startup/reload. Keep the Loom DB, authoritative project state, protected host paths and production/provider credentials outside it; mediate provider access through an approved credential/egress boundary. Raw shell works only in a restricted disposable workspace. Do not reuse a writable workspace for a successor until the old execution domain can no longer write; candidate output is promoted only through Loom gates.
  2. Owned privileged operations. Protected writes, merges, deployment and other privileged effects go through narrow Loom-controlled operations. Bind requests to supervisor-established run/thread identity; validate the final payload/target after rewrites and recheck kill, deadline, grant, policy and owner/epoch at the write/dispatch boundary. An earlier hook approval is not transferable to changed input. Serialize local writes with kill/lease state; a SQLite transaction cannot atomically cancel a remote request. Never wait for network I/O while holding its write lock.
  3. Independent completion. Only Loom can mark a task complete, using fresh trusted verification tied to the exact candidate artifact hash and reconciled privileged work. Pi prose, a resolved prompt(), agent_settled or a terminating tool result is not verification. Missing, failed, throwing, cancelled or timed-out verification leaves the task unverified/failed, never successfully complete.
  4. Fail-closed output handling. Owned output paths sanitize or withhold content before exposure or persistence, including partial streams, structured results, error details and spill files. A sanitizer failure returns a safe error, not the raw result. A tool_result hook alone is insufficient; secrets must not enter the execution domain unnecessarily.
  5. Explicit startup and channels. Use owned settings/loaders and only trusted, reviewed executable components; disable ambient autoload, uncontrolled MCP servers, codemode model calls and cache warming initially. Enable a channel only after its startup, authorization, cancellation, output and usage paths pass conformance. Disable unsupported UI/RPC/SDK Bash routes or confine them to the same execution boundary.
  6. Honest cancellation. Kill closes future admission/dispatch, revokes leases and triggers external execution-domain cleanup. Runtime ACKs or idle state do not prove descendants stopped. Already-dispatched external actions may still finish: record unresolved outcomes, reconcile target state and do not replay blindly. Idempotent replay requires a real effect-side deduplication contract; cancellation is not rollback.

No untrusted execution or production authority is enabled before these boundaries are tested. Sandboxing is therefore an adapter prerequisite, not optional hardening after unrestricted execution has shipped.

Provider/model selection is run-scoped, not an authority dependency. Loom's ledger, policy, budgets, recovery, audit and completion rules must not assume a vendor, model family or subscription. A provider/model pair is an explicitly selected, qualified integration; account and data-policy eligibility stay per-integration. No silent fallback, automatic account rotation or model substitution may turn one provider's failure or limit into another's effect. Codex/ChatGPT subscription is the first qualification candidate, not Loom's architecture. See ADR-010.

First milestone: session ledger, leases, audit (+ kill switch)

The implementation language/runtime is Bun. A scaffold exists (src/ library + CLI on bun:sqlite in WAL mode, bun:test + Biome + CI): workspace-wide leases with epoch fencing, a transition ledger, and audit inserts. Milestone 1 hardens this scaffold into enforcement per the research cited below; the scaffold's permissive paths (ungated writes, conventional append-only) are replaced, not extended.

  1. Session ledger. Persist run identity, phase, status, next/resume point, references to artifacts and evidence, and a monotonically ordered history of transitions so another process can recover after interruption. Resume is per (run, thread); approval pauses mint no rows (open running row + audit pause record is the paused state). Evidence refs are kind:locator pointers with content hashes for files. Side effects go through an outbox relay (same-txn business+outbox write, cursor relay, idempotent replay). Recheck each dispatch, not just a batch; unknown outcomes require reconciliation before replay unless effect-side deduplication is proven. Treat .itp/run.md as a framework handoff artifact, not an authoritative concurrent database. Research: research/phase-1/07-r12-pause-vs-turn.md, research/phase-1/08-r13-threads.md, research/phase-1/06-r11-audit-vocabularies.md, research/phase-0/04-phase0-findings.md (R-06).
  2. Mutation leases. Workspace-wide, single holder, TTL + heartbeat; epoch increments on post-expiry succession and the epoch is checked at the write path inside BEGIN IMMEDIATE (kill → deadline → grant → policy → lease order). Same-owner renewal keeps the epoch; stale owner+epoch can neither release nor finalize. Contention safety proven by experiment (8-process race → exactly one winner). Research: research/phase-0/04-phase0-findings.md (R-04/R-05/R-09), research/phase-1/05-r10-crash-recovery.md.
  3. Audit trail. Append-only by trigger (BEFORE UPDATE/DELETE … RAISE(ABORT); no authorizer exists on bun:sqlite), lifecycle as inserts: request → verdict → finish rows per action_id, current state = latest row. Decisions pending|allowed|denied|escalated|expired; outcomes pending|completed|failed|interrupted|timeout|not-executed; every row carries actor identity and tier. Retention is archival, never silent delete. Do not store secrets or raw credentials in artifacts or audit entries. Research: research/phase-1/06-r11-audit-vocabularies.md (schema v2 delta).
  4. Kill switch. Global + per-run scopes, latched; engage revokes leases by epoch bump, freezes pending approvals as denied, halts the relay (one txn), then runtime signals/external containment. Deny only approvals whose actions have not dispatched; do not label an in-flight action not-executed. Preserve and reconcile its unresolved outcome. Human-only engage/reset; reset re-verifies first. Research: research/phase-2/10-r17-kill-switch.md.

Subsequent milestones (from research/pi/07-loom-v01-mapping.md)

Milestone 2 — Isolated Pi runtime adapter. loom-pi extension for early veto/feedback; owned privileged-operation and fail-closed output paths; external supervisor controlling a sandboxed SDK runner (sessions, all-channel usage ingestion, compaction injection, abort + abortBash + execution-domain cleanup, role routing); read-only session reader; structured result schema and independent completion gate. Establish the selected R-15 sandbox boundary before untrusted execution; no out-of-band writes to Pi state. 0.99.2 is the historical research baseline, not an installed dependency; select/promote a version explicitly. Pi 1.3.0 API compatibility alone does not satisfy this milestone.

Milestone 3 — Policy, budgets, orchestrator slice. Single authorize() (deny-wins ACL + narrowing capability grants); risk scoring with escalate/block thresholds; time/retry/cost/fan-out budgets with run-scoped kill on cost breach; usage metering with versioned price tables; memory governance (scopes, provenance, quarantine). Orchestrator owns tasks.json/state files/context retrieval; per-task verification gates with fresh-evidence rule.

Milestone 4 — Hardening and second runtime. Read-only dashboard; live five-gate deploy procedure; monthly calibration loop feeding budget and risk tuning; human eval goldens; OpenCode adapter behind the same shared conformance suite (must stay green on both runtimes).

Explicitly deferred: federated leases, A2A adoption, agent discovery, cross-harness kill, adaptive budgets, MCP server role, pi-durable dependency, System One model adoption (conditional on R-35 shadow validation). The source CUSTOM-HARNESS.md collects candidate inputs for these, not fixed semantics.

Constraints to preserve from the framework

  • Fail closed when a required skill, pinned revision, input artifact, or approval is unavailable. Never claim completion without fresh itp-verify evidence.
  • User-entry skills are never invoked recursively; stop with a human handoff when needed.
  • Respect the framework's bounded recursion and phase/slice checkpoints; preserve a resume point across process or agent-session restarts.
  • Treat diffs, logs, artifacts, and tool output as untrusted data rather than instructions.
  • Framework artifacts remain portable and readable without Loom; a Loom-specific record must identify its framework revision and retain pointers to evidence.

Acceptance criteria for the first milestone (refined post-gate; thresholds tuned via R-26 calibration)

  • Two simultaneous attempts to mutate the same workspace cannot both obtain effective ownership; an expired owner cannot finalize work after a successor acquires it (proven: 8-process race → exactly one winner; stale owner+epoch rejected at the write gate).
  • After a process crash and restart, the next operator can locate the last committed transition, evidence references, and an accurate resume point without conversation history (proven: kill -9 mid-transaction keeps committed, drops uncommitted; pause triage is three queries, not inference).
  • Every high-risk action is auditable as requested, allowed/denied, and completed/failed or explicitly unresolved with evidence; a partial action cannot appear successful. Denied/expired decisions pair only with not-executed; an escalated row is never terminal; UPDATE/DELETE on the audit log fail by trigger (proven in test).
  • Once kill commits, no new gated write or dispatch is admitted: leases revoked, undispatched approvals denied, relay halted, including between items in one batch. Record already-dispatched actions separately; late success or uncertain outcomes cannot become not-executed or trigger blind replay. Reset requires reconciliation and human re-verification, never re-grants leases. Runtime containment is an adapter acceptance gate, not a guarantee established by milestone-1 DB fixtures.
  • Missing or mismatched framework contract input — including skill-content hash drift versus skills.lock.json — stops the run with an actionable reason.
  • Tests demonstrate the above under contention, expiry, kill, and restart (deterministic fixtures in CI per R-26); documented artifacts remain usable with the framework alone.

Adapter acceptance criteria (before untrusted execution / production authority)

  • Attempts through model/nested/deferred tools, SDK/UI/RPC Bash, extension execution, startup and model/usage channels are either disabled, confined or mediated; tests cover the final callable inventory, not just visibility.
  • Missing mandatory controls, a mutated approved payload or stale owner/epoch cannot authorize a privileged effect. The sandbox cannot access the Loom DB, protected host paths or production credentials directly.
  • A throwing redactor exposes no raw content on final/partial/structured/ spill paths; missing or throwing verification cannot complete a task.
  • Cancellation tests include surviving descendants, unawaited host calls, post-abort spawn races and delayed remote completion. Prove local-domain cleanup; record/reconcile remote uncertainty rather than claiming undo.
  • Run the permanent release-pinned conformance corpus, including real provider/MCP and sandbox integration for every enabled channel. The current offline API and 16 execution component probes do not close this gate.

Decisions still open

  • Sandbox backend/rung per deploy and its cleanup evidence; isolation of the whole execution domain from Loom authority is fixed, not optional.
  • Concrete privileged-operation transport, effect-specific idempotency/ reconciliation and output filtering mechanics, to prove in adapter tests.
  • Budget defaults, risk weights/thresholds, and per-runbook policy tuning — starting values researched, final values come from R-26 calibration history.
  • Dashboard shape and drill-down depth (read-only constraint is fixed).
  • Multi-agent wire and federation (deferred until a remote-agent use case).
  • System One model adoption (conditional on R-35 shadow validation; banned from authorization/completion paths until then).

Decided by research since the last revision: runtime integration order (Pi adapter first, OpenCode second — research/runtimes/23-opencode-vs-pi.md); lease scope, fencing, and persistence (workspace-wide, epoch fencing at the write path, SQLite WAL — research/phase-0/04-phase0-findings.md); high-risk taxonomy and audit retention (research/phase-1/06-r11-audit-vocabularies.md, research/phase-0/04-phase0-findings.md R-03); pin + drift policy (research/phase-0/04-phase0-findings.md R-08).

Active phase specification

  • Work package: DeltaDB-inspired independent software research; P2 paused.
  • Authority: owner requests extensive research on https://delta.dev, building similar software in a separate repository (not direct product adoption), Loom compatibility, pros/cons and recommendation before continuing. Owner subsequently authorizes committing the research and a post-isolated-runner-seam timeline reminder for the separate standalone build.
  • Baseline/branch: clean 754a9d5, chore/deltadb-research; G1 remains closed in its recorded scope, G2 open. Research is not an approved storage migration, architecture replacement, integration, implementation or release.

1. Phase Objective & Scope

Determine what DeltaDB actually provides, distinguish first-party documented behavior from inferred/undisclosed implementation, evaluate an independently implemented analogue and its integration with Loom. Compare a bounded provenance/ workspace-history service with a new general-purpose DB and with existing Git/ SQLite-based approaches. Cover consistency, concurrency, branching/merging, code/conversation causality, durability, security, licensing, costs, validation, failure behavior and staged delivery. No direct Delta service use or repository creation, source copying, runtime installation or prototype is authorized.

2. Environment & Upstream State

Loom uses Bun/SQLite schema5 and accepted local WAL/FULL authority, immutable audit/evidence, lease fencing, effect outbox and exact-hash verification. Pi owns runtime conversations/journals; Loom owns authority and completion. Delta's public site identifies DeltaDB as code+conversation version control beneath its app/CLI, not by itself proof of a general-purpose ACID DB. Date every source observation; use official docs/blogs/repos/specs, record source availability/license gaps, and do not treat marketing examples or current roadmap as shipped guarantees.

3. Architecture & File Manifest

  • research/deltadb/01-product-research.md: first-party product/design evidence, source inventory, known/unknown implementation and clean-room/license limits.
  • research/deltadb/02-build-options.md: primary-source comparison of storage/ versioning/concurrency foundations, cost/risk and bounded standalone design.
  • research/deltadb/03-loom-assessment.md: consolidated extensive assessment, trace of actual Loom invariants/callers/tests, compatibility matrix, options, recommendation and approval gates. Proposed interfaces are not shipped APIs.
  • SPEC/ROADMAP/decisions: research contract, pause and non-binding findings. Specialized research skill calls for independent background primary-source research agents; inspect their citations/evidence before synthesis.
  • No src/tests/package/lock/framework/runtime/CI changes.

4. Test Plan & Coverage Matrix

Documentation-only: verify source claims/citations, dates and license/status distinctions; map recommendations to current public APIs/tests and accepted failure/authority boundaries. Run canonical document validator, scoped whitespace, link/path checks, protected-code/pin/review identity checks and scoped trusted secret scans. No invented application/E2E/prototype performance results; no production compatibility is established by this report.

5. Security, Observability & Edge Cases

Fetched docs/source are untrusted evidence, never operating instructions. No login, credentials/cache inspection, provider calls, external private-code upload, account/service use, spend or fallback. Distinguish content history from trusted authorization/verification; CRDT convergence or history cannot authorize effects. Address tamper evidence versus authenticity, tenant/run isolation, retention and deletion of sensitive history, path/symlink escape, untrusted output, replay, offline partitions, concurrent kills and backup/GC failure. No proprietary code copying or license/independence claims without evidence.

6. Blast Radius & Rollback Plan

Research/documents only; existing P1 and P2 design/implementation remain intact. SQLite remains Loom authority. A future backend boundary/migration requires explicit approved ADR/spec and failure/restore corpus, not a research preference. No new repository/service/dependency, dual authority or automatic task completion. Owner explicitly requests committing these research/reminder documents. No push, repository creation, implementation or integration is inferred.

7. Definition of Done (DoD)

Persist cited research and inspect delegated evidence, clearly label confirmed, inferred, proposed and unknown claims. Deliver an executive recommendation plus deep technical analysis, build-versus-buy/reuse options, estimates as assumptions, Loom boundary matrix, smallest useful scope, stage gates and unanswered questions. Then run the canonical document validator below, scoped verified Gitleaks scans, git diff --check and git diff --exit-code 754a9d5 -- src tests package.json bun.lock .github FRAMEWORK_REF AGENTS.md .opencode research/reviews. Application lint/typecheck/tests/coverage/audit N/A because no application or dependency changes; retain previously verified baseline without calling it a new research gate. P2 resumes only after the owner's disposition of findings.

Research execution record (2026-10-25): three cited reports persisted; primary product/design and build-foundation evidence gathered independently, then parent traced actual public Loom APIs, SQL/schema/transaction boundaries, synthetic-only outbox, evidence syntax, reset snapshots and safety tests. Material first-party product/security/storage/early-access claims and selected Git/SQLite/CRDT source claims were cross-checked. Core implementation/complete wire format/durability remain unproved; hypothetical Rust was not treated as production source. Exact observed source revisions and unrendered/unavailable evidence limits are labeled in reports. Parent adds independent diamond-types source review and phased recommendations; no account/service execution, dependency installation, application edit or benchmark. Main assessment: 03-loom-assessment.md. Recommendation awaits owner disposition, not a storage/authority migration decision. Research gates: canonical document validator exit0 (310 local links/seven active sections/unique ADRs/casing/whitespace); all six task files pass verified Gitleaks8.30.1 scans; git diff --check exit0; protected code/tests/config/pins/ prior reviews unchanged against 754a9d5. Report-local whitespace and illustrative capacity arithmetic checked. Reports total1,325 lines; source pages/revisions are cited, not claimed as independently exercised product behavior. Application checks N/A to this docs-only research; no implementation/benchmark/legal review was performed. Owner subsequently requests committing research and fitting the separate standalone build into the timeline after the isolated-runner seam as a reminder. ROADMAP records this as a milestone-relative revisit after tested T-09/T-15 supervisor/IPC/rootless cleanup and before P3 scope review, not allocated work inside existing week forecasts or a new G2/P3 prerequisite. Separate build scope, retention/license/recovery and explicit reforecast remain required; no SQLite replacement, new repository, package/service or P2 implementation starts. Research files remain unchanged; validate the updated governance and all six task files before the authorized commit. P2 remains paused by this task. Final commit preparation: document validator exit0 (311 local links/seven active sections/unique ADRs/casing/whitespace); six verified task-file secret scans and git diff --check pass; three research report hashes unchanged and protected code/config/pins/prior reviews unchanged. Application checks remain N/A to this documentation-only commit. No push or separate-project build is authorized.

P2 kickoff execution record (historical)

  • Work package: P2 kickoff / T-09–T-15 discovery and baseline fixture repair.
  • Authority: owner stated “Merged, continue”; PR #5 merge independently verified at ffbfd47e042214f543593c8e5481fe1f155ab2a5, current remote master.
  • Baseline/branch: clean merged tree identical to 803e5f6; feat/p2-runner-contract. G1 remains closed for its recorded synthetic scope; G2 remains open. A newly reproduced fixture startup race blocks a clean P2 baseline; no runtime/dependency promotion or real execution is inferred.

1. Phase Objective & Scope

Prepare the first isolated-runner work package using accepted SDK1.4.0 and rootless Docker direction. Repair only the existing outbox fixture's startup barrier so it tests concurrent relay admission rather than simultaneous DB-open recovery. No SDK installation, container launch, mount/system change, framework installation/re-pin, provider/broker/live use or application implementation.

2. Environment & Upstream State

Fresh Bun1.4.4, Node26.7.0, rootless Docker client/server29.9.2; daemon reports rootless, overlayfs, systemd/cgroup2. The previously capped workspace mount is absent (findmnt --mountpoint exit1); do not recreate/mount it without scoped operator authorization. Pi is not a Loom dependency and prior external comparison installation has expired. Read-only registry SDK1.4.0 tarball matches ADR-005's SHA512; declarations, implementation and shipped changelog re-read, not executed. Source details and pending qualification are recorded in P2 kickoff. Selected framework2.1.0 remains unchanged.

Merged baseline lint26 files/strict check pass. Full coverage exits1 (142 pass, 1 outbox fixture failure,2,076 assertions;100% functions/98.11% lines). Ordered drill/audit did not run after failure. Isolated relay race test fails3/30 runs; minimal two-child DB-open probe fails2/60 pairs with SQLITE_BUSY/RECOVERY in schemaKind before child readiness/busy-timeout setup. This is a fixture setup race, not evidence of duplicate dispatch or a reproduced upstream defect.

3. Architecture & File Manifest

  • tests/outbox.test.ts: reuse tests/runs.test.ts's sequential connection-ready barrier, then release both real child processes together. Keep independent target DB and all one-effect/one-admission/history/exit/stderr assertions.
  • docs/p2-runner-kickoff.md: remap T-08–T-11/T-15 to accepted runtime, planned ownership, staged implementation scope and material setup/promotion approvals.
  • SPEC.md, ROADMAP.md, decisions.md: active seven-section contract, verified merge, baseline issue, evidence and explicit disabled boundaries.
  • No src/exports/package/lock/CI/schema changes; no second runtime loop.

4. Test Plan & Coverage Matrix

Before correction, bun test tests/outbox.test.ts -t 'real competing non-idempotent' reproduces missing-ready failure. A diagnostic two-process bootstrap captures SQLite busy before relay; no instrumentation belongs in application code. After correction, repeat the exact test100 times, then full ordered gates and empty-/tmp full coverage. Children must both reach readiness before release; relay work still competes and only one unconfirmed admission/effect is retained. Compare coverage with100% functions/98.11% lines; no skipped tests or added retries.

5. Security, Observability & Edge Cases

Live providers, credentials/caches, extra spend and automatic fallback remain disabled. SDK default model/auth/resource discovery is not safe startup policy; explicit isolated runtime resources are needed before promotion. Docker context name alone is not trust proof; absent capped mount/digest image/log limit blocks runner launch. Bubblewrap remains a research/test fixture, never a backend fallback. Baseline diagnostics use synthetic DBs; preserve child cleanup and truthful failures. SQLite busy remains explicit; do not alter public store semantics to make a contention fixture green. No actual host resources removed.

6. Blast Radius & Rollback Plan

Only fixture startup scheduling changes; actual relay race is retained. Rollback is reverting the new fixture scheduling, no data migration or runtime cleanup. Preserve the complete P1 review/approval/evidence history. P2 discovery does not qualify containment or reopen G1 silently; this baseline failure and repair remain visible. Leave changes uncommitted absent commit authorization.

7. Definition of Done (DoD)

Run bun run lint → bun run check → bun test --coverage, then100 independent invocations of bun test tests/outbox.test.ts -t 'real competing non-idempotent', then bwrap --ro-bind / / --tmpfs /tmp --dev-bind /dev /dev --proc /proc bun test --coverage, bun run drill, bun audit; all required exits0, no reduced coverage. Then verified scoped Gitleaks scans, canonical document validator, git diff --check and unchanged application/pin/dependency/review checks. Record actual results, not yet passed claims. Owner approves next package's precise dependency/image/ mount work before runtime integration or lab effects; no push/commit inferred.

Execution evidence (2026-10-25): fixture setup corrected using the existing phase-writer readiness pattern, then all declared checks exit0: lint26 files, strict check,143 tests/2,082 assertions,100% functions/98.11% lines (unchanged per-module coverage),100 independent targeted runs, empty-/tmp full143/2,082, automated drill and14-package audit/no advisories. No assertions deleted or test retries introduced. Public store/relay logic unchanged. Official tag API freshly confirms SDK1.4.0 source commit 4a080252f06caf63a525d7873c5d94d3c23887e0; registry/source inspection is not dependency installation or containment proof. Exact image/mount/IPC/log contract and setup authorization remain next, not a new supported runtime claim. Final scoped checks exit0: canonical document validator291 local links/seven active sections/unique ADRs/casing/whitespace; five verified Gitleaks8.30.1 task-file scans; git diff --check; protected application/config/pin/prior-review diff empty against the verified merge. No new fixed-artifact advisory or owner approval claimed for the fixture patch. Owner subsequently authorized committing the verified fixture repair and kickoff records; publication remains separate. no remote CI evidence exists for this patch and G2 remains open.

T-07 completed execution record (historical)

  • Work package: P1 / T-07 CLI v1 and offline conformance, started 2026-10-24.
  • Authority: owner requested “push and continue” after approved T-06 commit 9f3241a; confirmed additive v5 run/evidence storage, lease-gated init/record, human default/explicit JSON, synthetic kill controls and pinned offline scope.
  • Baseline/branch: clean 9f3241a, feat/p1-cli-conformance.
  • Status: implementation, ordered offline gates and fixed-artifact advisory verified with no confirmed findings; corrected T-07 555586b has verified green remote CI and Ishan approval relayed by the owner. Personal drill execution attested at ffed35e; exact provenance/limits recorded in G1 evidence. G1 CLOSED on 2026-10-25 under the owner's conditional closure authorization after acceptance evidence was checked; actual framework qualification blocks affected execution, not synthetic G1.

G1 closure / merge preparation (2026-10-25): owner requested “Close G1 if it satisfies the spec and prep for merge”. The SPEC first-milestone criteria and ROADMAP P1/G1 exit are satisfied in their synthetic/core scope: immutable audit, migration/restore fixtures, native contention/recovery, final admission/ kill/replay safety, framework drift rejection, recorded operator demonstration, Ishan approval relayed for 555586b, and verified exact-artifact CI. Evidence was committed first as 7f85871. Human demonstration remains attributed to ffed35e; the correction changes fixture parent setup only and reruns the drill in CI, not a new human demonstration. The owner authorizes closure with these recorded limits; no containment/provider/actual-installation qualification follows.

Scope/files: documentation-only closure in SPEC, ROADMAP, ADR-019 and G1 evidence; local P1 PR draft, no published PR or merge. Remote default target is master at 2be0e4fe7a593887ce690062e68a8dfaeaf170a7, ancestor of the whole P1 stack. GitHub compare reports behind0; local git merge-tree --write-tree against that exact target exits0 without conflict. Local origin/master is stale; use the API-verified target rather than claiming its cached ref is current. This is a point-in-time merge check, not a branch-protection/mergeability promise.

Fresh closure gates at 7f85871: lint26 files, strict check, full143 tests/ 2,082 assertions (100% functions/98.11% lines), focused31/144, automated drill and audit14 packages/no advisories all exit0. Full coverage also exits0 in a separate Bubblewrap empty-/tmp namespace, with identical totals/coverage. No application/test/workflow/dependency changes. Preserve prior advisory bytes; document/secret/whitespace gates apply to the closure record. Rollback/merge cautions remain schema5 backup/restore plus reconciliation and explicit JSON caller migration; never delete newer history or bypass safety tests. G1 closure does not authorize push, PR publication, merge, P2 implementation or deployment. Closure document gates: canonical validator exit0 (289 local links/seven active sections/unique ADRs/casing/whitespace),43 P1 merge-scope verified Gitleaks8.30.1 scans exit0, git diff --check exit0. Previous advisory/report hash unchanged; implementation/tests/workflow/pins match accepted 555586b. Closure/PR draft documents are authorized for commit by the owner's subsequent “commit” instruction; publication remains separate. Final published PR head CI and branch requirements must pass before merge; no remote check is claimed for local docs.

Pre-closure evidence recording (2026-10-25): owner states “Approved 555586b by Ishan, Record the closure evidence and commit before G1 closure”. Scope is documentation only: this active phase, ROADMAP, ADR-019, G1 evidence and an append-only parent record in the original advisory. Preserve the frozen AI report/manifest and distinguish its original pending template from later owner-relayed approval; no new AI review or independently authenticated human signature claimed. Verify remote run40178607723 at full SHA 555586b8d00e5d3350bd671054b5a97140ecfbdb: all required steps success,143 tests/ 2,082 assertions,100% functions/98.11% lines, drill/audit pass. Human evidence is the supplied drill output and owner personal-execution statement at ffed35e299726c9868b3fecfbe725f67edd4dc29, not a claim of a human rerun on the corrected SHA. No application/drill-script changes in the correction. Retain selected framework pin; fixture conformance satisfies G1 drift proof, actual installation checks still gate affected framework execution (ROADMAP G1 exit/ risk register; T-07 fixture test contract). No installation/re-pin, closure, merge, push or P2 authorization. Validate docs/whitespace, append-only report identity, unchanged implementation and verified task-file secret scans before committing. Application gates N/A to this documentation-only update; cite the verified accepted-artifact CI instead of manufacturing a new application result.

Pre-closure documentation gates exit0: canonical validator286 local links/seven active sections/unique ADRs/casing/whitespace; five task-file verified Gitleaks8.30.1 scans; git diff --check. Original report bytes are an unchanged prefix and embedded manifest hash matches; no application/test/workflow/pin diff. Appended report SHA256: ceca07bed47c1e39bb80b01c064a508387acbbd713517bf7ca36d54a92d532fa. Application tests were not rerun for this docs-only record; remote CI above provides the exact accepted-implementation evidence. G1 remains open.

CI correction work package (2026-10-25, owner requested “Fix it”):

  1. Objective/scope: remove fresh-runner/test-order dependence on an existing /tmp/opencode; test infrastructure only, no production behavior or workflow changes. Prior approval applies to the prior artifact, not this correction.
  2. Environment/upstream: failed remote run40173273410 at ffed35e299726c9868b3fecfbe725f67edd4dc29, Bun1.4.4. Lint/typecheck pass; coverage reports134 pass/9 fail from ENOENT; drill/audit skipped. Local Bubblewrap with an empty tmpfs /tmp reproduces12 failures in44 focused tests (including three run tests otherwise masked by earlier fixture setup). No runtime/dependency change or upstream API issue is implicated.
  3. Architecture/files: tests/fixtures/framework.ts creates its parent before allocating a unique directory, covering framework/CLI/drill callers. tests/policy-corpus.test.ts and tests/runs.test.ts do the same at their three independent allocation sites each, following existing test patterns.
  4. Regression matrix: existing public/native-process assertions run in an empty /tmp namespace, each affected test file independently and standalone drill, plus full coverage corpus. No assertions or coverage exclusions removed.
  5. Security/edges: no removal/rename of host /tmp/opencode; Bubblewrap overlays only the child mount namespace. Recursive mkdir remains idempotent, unique child cleanup unchanged; no credentials/provider/real effect access.
  6. Blast radius/rollback: fixture setup only; revert these additions to restore the earlier behavior, without changing store/schema/pins or evidence. Owner's reported human drill and Ishan approval remain attributable to the previous artifact; neither approves this patch or closes G1.
  7. DoD: ordered commands below, followed by three independent invocations of bwrap --ro-bind / / --tmpfs /tmp --dev-bind /dev /dev --proc /proc bun test FILE for tests/framework.test.ts, tests/policy-corpus.test.ts, tests/runs.test.ts; same prefix with bun run drill and bun test --coverage; then verified task-file secret scans, canonical document validator and git diff --check. Remote rerun requires publishing a corrected artifact; no push/merge inferred.

CI correction evidence: pre-fix empty-/tmp focused command above exits1 (32 pass/12 ENOENT failures). After seven parent-directory setup additions, ordered lint (26 files), strict check, full coverage (143 pass/2,082 assertions, 100% functions/98.11% lines), focused31/144, automated drill and audit (14 packages, no advisories) exit0. Initial lint caught import formatting; corrected before restarting the full ordered gates. Independent empty-/tmp runs exit0: framework6/17 assertions, policy23/1,184, runs15/67, standalone drill and full coverage143/2,082 with unchanged coverage. Bubblewrap overlays a fresh tmpfs per invocation; no host temporary directory was removed. No runtime/schema/ workflow/dependency changes. Owner authorized correction commit; unpublished. Failed remote run remains failed, no corrected remote CI or new review approval claimed. Final correction checks: six task files pass verified Gitleaks8.30.1 scans; canonical document validator exit0 (283 links/seven sections/unique ADR IDs/ casing/whitespace); git diff --check exit0. Protected application/workflow/ dependency/pin/prior-review diff is empty. No new fixed-artifact advisory has been requested or obtained for this correction; earlier approval is not reused.

1. Phase Objective & Scope

Make CLI orientation and recording complete without becoming a runbook executor. Persist runbook/goal/scale/framework proof, reject re-init and concurrent open phases, preserve repeatable evidence and expose a read-only resume bundle. Require existing host-prepared DB/live lease for init/record; no automatic lease acquisition or successful-task-completion inference from a committed phase. Add synthetic kill status/engage/plan-reset/reset through approved controls; fresh reset snapshot, human attribution and evidence remain mandatory. Verify actual installed framework revision/content and explicit installed skill roots, not default/supplied revision claims. Assemble deterministic CLI/process/drill fixtures and pin CI to qualified Bun1.4.4 with ordered gates. No providers, network model calls, real adapters/effects, credential inspection, framework installation/re-pin, sibling edits, production containment or automatic G1 closure.

2. Environment & Upstream State

Fresh baseline: lint20 files, strict check,112 tests/1935 assertions,100% functions/97.04% lines (store99.68%, policy98.00%), dependency audit14 packages/ no advisories. Bun1.4.4/SQLite3.53.4 and existing locks remain unchanged. Configured I2P_PATH=../I2P has HEAD bd0cacc5a0a81d41311782d2b20f778ee7b40392 (4.0.0), not selected 4fe0869ae41b0d81cbe3c6bc643f10ff2049ceed (2.1.0). Read selected revision's lock/hash script through Git objects; do not adopt the sibling's current26-entry lock in place of pinned23 entries. Official pinned hash method sorts relative paths with localeCompare, hashes each path+NUL+ bytes+NUL; use Bun/stdlib, no upstream installer or network version checker. Synthetic fixtures may supply their own explicit framework ref in isolated cwd; Loom's committed FRAMEWORK_REF must remain unchanged. Real configured checkout must fail until the owner supplies a matching installation.

3. Architecture & File Manifest

File Responsibility
src/store.ts Additive exact-signature v5 migration, immutable run/evidence tables, existing-store opening without creation, preserve gates/control invariants
src/runs.ts Atomic run registration/phase lifecycle, multiple evidence links and coherent read-only resume bundle
src/framework.ts Actual Git revision/version/clean-tree/lock validation and installed skill-directory hashing, fail closed without execution/network
src/cli.ts, src/index.ts Strict flags/required inputs, safe errors, human/JSON output, explicit synthetic controls and public exports
tests/cli.test.ts, tests/framework.test.ts, tests/runs.test.ts CLI subprocess contracts, framework drift and run/evidence/lifecycle regressions
tests/fixtures/framework.ts, tests/fixtures/schema-v4.sql Synthetic local Git/skill fixture and fixed independent historical v4 migration input
tests/evals/human-flow.ts, docs/cli.md Throwaway synthetic operator drill and public command/limitation documentation
Existing schema/gate/kill/outbox tests Advance current schema assertions; adapt changed CLI JSON flags without deleting safety checks
.github/workflows/ci.yml, package.json Ordered pinned offline checks and drill command; no dependency changes
SPEC.md, ROADMAP.md, decisions.md, review report Contract, evidence, decisions and separate human disposition

V5 adds immutable runs metadata and ordered transition_evidence references; no invented metadata or evidence links for historical rows. Init inserts metadata and opening transition atomically under the live bookkeeping gate; existing run or historical run identity cannot be adopted by re-init. New run APIs enforce one running phase per run/thread and terminal closure of the matching phase. Existing low-level ledger APIs remain trusted bookkeeping, not task completion. Status reports the most recent committed row, running phases, open/interrupted actions, unresolved outbox, leases, kills and explicit budget modes in one read snapshot. Missing DB returns an empty bundle without creating/migrating it; unknown run in an existing store fails actionably. CLI operations require current schema; host explicitly prepares/migrates with public store APIs.

Framework check uses cwd FRAMEWORK_REF as trusted expected config, checks actual Git HEAD/VERSION and dirty-tree state, validates the selected lock, then hashes every lock entry from an explicit <skills-root>/<id> directory. Missing content, malformed locks and symlinked skill entries fail closed. No ambient global lookup or fetching/installing to make checks pass. Init stores the resulting revision/ lock digest; it never accepts a caller's self-asserted --commit as proof.

4. Test Plan & Coverage Matrix

  • Migration: exact v4→v5 and prior versions, data/guards retained, no synthesized run identity/evidence, rollback on fault, unknown/tampered schema rejected.
  • Runs: atomic init and evidence rollback, existing/historical identity reject, one open phase per run/thread, matching terminal close, repeat evidence/file hash syntax, unknown run, live kill/owner/epoch/expiry gates, snapshot status.
  • Framework: synthetic local Git expected ref; correct hash, one-byte drift, missing files/lock, duplicate/traversing IDs, symlink entries, changed tracked files, revision/version mismatch and no automatic installation. Near-miss results must be machine-readable without raw source/error leakage.
  • CLI: strict options/duplicate/missing values, status default human/--json, init→running→committed→status, repeat evidence, re-init/double-open/unknown-run failures, stderr/nonzero and no stacks; absent status does not create DB.
  • Critical CLI: explicit synthetic flag/human actor/evidence, scoped/global kill status, no post-kill write, stale/blocked reset reject, no lease revival.
  • Process/regression: real CLI subprocesses and conflicting phase writers; all approved T-01–T-06 contention/recovery/policy/outbox/control tests retained.
  • Drill: automated throwaway fixture traces init/record/status/approval pause/ interruption/kill/reset; no live provider or production target. Agent execution is not a human-run attestation; human execution remains an explicit handoff.

SQL only builds fixtures/asserts history; behavior uses public APIs/real processes. Record aggregate and per-module coverage versus baseline, never skip tests or exclude guards to manufacture non-regression.

5. Security, Observability & Edge Cases

Trusted host identity/context/clock/SQL remains a boundary, not authentication. CLI is not an untrusted-agent IPC endpoint; human: syntax proves no identity. Require explicit --synthetic for critical changes, no automated kill/reset, and reuse current state-bound reset rather than inventing upload/approval tokens. Do not await under DB writer locks. Read-only commands never create/migrate stores. Validate final flags, kinds, integer epochs, bounded text and evidence; file evidence requires a SHA256 locator, not raw file contents. Safe actionable errors exclude stack traces, source bytes and credentials. Missing/changed framework input is a failure, never fallback to installed latest or pin claims. No process/provider/conformance result implies verified task completion.

6. Blast Radius & Rollback Plan

CLI JSON default changes only with approved explicit --json migration in callers/tests. Public run APIs are additive; existing ledger/audit/kill APIs and history remain compatible at v5. Old binaries reject v5 rather than downgrading. Rollback uses a pre-upgrade copy/restore with reconciliation; never destructive down-migration of new run/evidence history. Tests use temporary files under /tmp/opencode and synthetic Git config, never actual sibling/credentials. Push remains blocked; no remote publication or CI execution is claimed. Actual framework installation is mismatched/unqualified; fixture conformance is not real runtime qualification. Human drill/review and broader G1 obligations remain separate; do not advance phase automatically.

7. Definition of Done (DoD)

Run and record exact scope/results in order:

bun run lint
bun run check
bun test --coverage
bun test tests/cli.test.ts tests/framework.test.ts tests/runs.test.ts
bun run drill
bun audit

Then trusted task-file secret scans, document/whitespace/protected-pin checks, fixed-artifact ishan-reviewer advisory and persisted report. Restart affected gates after corrections; maintain baseline100% functions/97.04% aggregate lines or resolve a documented coverage gap before closure. Required missing checks block affected completion. Record the actual framework mismatch, SSH push blocker, unrun remote CI/human drill and next owner honestly. No commit/push or G1 closure is inferred from this work package; retain explicit owner boundaries.

Execution evidence (2026-10-24–25):

  • Post-commit continuation: authorized T-07 commit is f888e6823c7ca67d8fb8a778d56c9b87b45d5a2b (22 verified files); working tree clean immediately afterward. Subsequent G1 evidence matrix maps existing synthetic/native-process proof to exact-artifact CI, human drill, Ishan disposition and actual-installation handoffs. This is documentation-only discovery within T-07, not a new implementation phase or G1 approval. Closeout documentation commit was separately authorized by the owner; no G1 approval or push authority is inferred.

  • Follow-up documentation validation: canonical document validator exit0 (283 links/seven active sections/unique ADRs/casing/whitespace), three changed documents pass verified Gitleaks8.30.1 scans, git diff --check exit0. Persisted review hash and non-governance manifest identities remain unchanged. Application/typecheck/coverage/drill/audit were not rerun for this docs-only follow-up; fresh pre-commit results above still describe unchanged code.

  • Acceptance reds reproduced the installed-revision/default-claim mismatch, one-byte skill drift, changed lock, duplicate ref keys, missing-status DB creation, absent run APIs/v5 schema, absent synthetic kill CLI and missing public drill command. Gates were built through the confirmed CLI/public API seams after those failures, not by executing framework runbooks.

  • Additional native regressions reproduced stale reset planning after v5 evidence append, inconsistent prior phase history being followed by a write, raw malformed VERSION content in failure diagnostics, local Git replacement refs substituting another tree under the selected commit, and an empty file evidence locator being accepted. These now reject at their shared owner.

  • Fresh ordered gates (2026-10-25): bun run lint exit0 (26 files), bun run check exit0, bun test --coverage exit0 (142 tests/2079 assertions; functions100%, lines98.11%; framework92.78%, runs96.27%, store99.68%, policy98.00%, index100%). Baseline100% functions/97.04% aggregate lines is exceeded; store coverage remains99.68%. Fixture coverage is included in Bun's aggregate. CLI subprocess execution is not instrumented in that parent-library coverage summary; CLI behavior has direct real-process assertions.

  • Declared focused command passes three consecutive runs:30 tests/141 assertions each. Real competing phase writers produce exactly one open phase; existing contention/recovery/control/policy corpus remains in the full suite.

  • bun run drill exit0: real subprocess trajectory covers framework→init→phase commit→awaiting-human→interruption→kill→denied write→plan/reset→stale-lease rejection. Output explicitly says automated-fixture-only and verifiedTaskCompletion:false, not human acceptance or task verification.

  • bun audit exit0:14 packages/no advisories, no auto-fix. Runtime probes: Bun1.4.4, SQLite3.53.4, Git2.56.0. CI is configured for the same Bun and ordered offline checks; remote execution has not occurred because push is blocked.

  • Subsequent legacy-output regression found a forged kill-status line embedded in a historical phase name. Human labels now neutralize controls before line assembly; JSON preserves escaped historical facts. Restarted ordered gates exit0:143 tests/2082 assertions,100% functions/98.11% lines; focused31 tests/ 144 assertions pass three runs; drill and audit pass. Source/test code is the fixed candidate for review; no unsafe output or history rewriting waived.

  • Human execution/review of the drill, actual selected framework installation, SSH publication/remote CI, independent human review and G1 disposition remain explicit handoffs. No installation/re-pin, credentials, provider calls or real effects were used to manufacture qualification. Secret/document/protected-pin checks and fixed-artifact advisory are the remaining local closeout checks.

  • Pre-review security/document checks (2026-10-25):21 scoped task files pass verified Gitleaks8.30.1 scans; archive digest/executable match the approved pin. Temporary scanner storage had expired and was recovered at that same digest, not upgraded. Document validator passes279 links/seven active sections/ unique ADRs/casing/whitespace; CLI guide whitespace and protected-pin checks pass. Existing v1–v4 DDL and dependency versions remain byte/value-identical; prior review reports and sibling worktree remain unchanged. Explicit actual check-framework probe exits1 with selected-vs-installed commit mismatch, empty stdout and safe JSON reason; no installed skills/provider access is attempted after that mismatch. Advisory and final report scanning remain.

  • T-07 advisory, review T07-20261025-01-AI-01, recommends READY FOR HUMAN REVIEW with no confirmed current-scope findings. Reviewed base 9f3241aa2186b1ac975f60eb09f7b367cee1fc68 plus immutable overlay T07-20261025-01, manifest SHA256 f27b710ed73deef65c2d3263f72adbccd9c3873774f8b0f27c76364c153e5c8c. Pre-commit-authorization report (including parent custody/manifest) SHA256 22e412a2336213b5208c66737c42d0b445774fe14d837512e9b8ce9eef4804f7. Original advisory bytes are unchanged; durable embedded manifest matches the frozen payload and current source/test/fixture/CI/guide hashes. Workspace review copy removed after archive byte-match; no snapshot copies belong in the task diff. Human disposition, commit, T-08/G1 and actual qualification remain pending; neither T-06 approval nor AI advice transfers authority.

  • Authorized T-06 push was retried on2026-10-25 and again failed exit128 with SSH public-key authentication denial. No successful publication, remote CI, changed remote or credential inspection claimed. Owner still owns access restoration, matching installed framework and attributable human drill.

  • Final local closeout (2026-10-25): post-review lint/strict check,143-test coverage (2082 assertions;100% functions/98.11% lines), focused31/144, automated drill and dependency audit pass again. All22 task files, including the persisted advisory/custody manifest, pass verified Gitleaks scans; document validator passes281 links/seven active sections/unique ADRs/casing/whitespace. Report and embedded manifest hashes match; all reviewed non-governance files remain byte-identical. Protected pin/dependency/prior-review checks and git diff --check pass; no workspace review copies remain. This completes local implementation evidence only: uncommitted, human disposition and qualification handoffs pending, no T-08/G1/production advancement.

  • Commit/continuation authority (2026-10-25): owner stated “pushed, commit T-07 and continue”. T-06 publication is owner-reported, not independently verified: git ls-remote origin refs/heads/feat/p1-policy still fails SSH authentication for this agent. No remote CI result is inferred. Owner explicitly authorizes T-07 commit; this does not supply Ishan disposition, human drill evidence or T-07 push authority. Fresh declared ordered gates pass with143 tests/2082 assertions, focused31/144, automated drill and clean audit; reviewed code/test/CI hashes remain unchanged. Continue G1 closeout evidence and discovery, not automatically into T-08/P2 implementation or live effects. Authorization-appended report SHA256: 3a87e11556e47c4c818ba9eaa45c58a7dd2c0a29d7c9c8b27112481bfcb850f0.

T-06 completed execution record (historical)

  • Work package: P1 / T-06 policy, grants and budgets, started 2026-10-24.
  • Authority: owner requested “commit and continue” after T-05 approval and confirmed the additive effect gate, root/grant boundary, deny/ask budget breach, no schema v5, risk subset and public test seams.
  • Baseline/branch: clean aa4872b, feat/p1-policy; T-01–T-05 approved as relayed by the owner. No push/production/provider/real-effect authority.
  • Status: implementation, ordered code gates and corrected fixed-artifact advisory verified with no open confirmed findings; approved by Ishan as relayed by the owner, who explicitly authorized the T-06 commit. G0 closed, G1 open.

1. Phase Objective & Scope

Add one additive synthetic effect-admission point, authorize(db, request, policy), that evaluates kill → deadline → grant → policy/risk/budget → lease, then draws the tool-call budget and writes attributable audit rows. Keep the approved T-02 writeGate as the ledger/bookkeeping gate; it is not effect authorization. Root/supervisor requests are policy-only; delegated requests need a live narrowing grant. Deny-wins ACL rules are global→run→thread; grants can only narrow policy. Every relay dispatch is authorized again; no reusable allow token. Budget caps fail closed with deny/ask plus an audited breach; automatic kill is deferred. Add grant mint/query, budget limit/read/draw, usage metering and retry-bucket primitives on the existing v4 tables. No schema v5, live provider, real adapter, CLI critical command, automatic kill, production containment or G1 closure. T-07 owns CLI harden/conformance; P2/P3 own real workers, live usage and spawn/live-thread integration.

2. Environment & Upstream State

Baseline is clean aa4872b: Bun 1.4.4, SQLite 3.53.4, lint/typecheck pass, 86 tests/719 assertions, 100% functions/95.78% lines, audit clean (14 packages). No runtime/dependency upgrade. Reuse the existing synchronous immediate/ savepoint behavior and v4 DDL; never await under a DB writer lock. Policy config is trusted host input; stored observables are audit/usage/lease/grant rows. Gitleaks 8.30.1 remains a temporary verified download, not a committed tool. Installed bun-types/sqlite.d.ts transaction declarations and official bun-v1.4.4/src/js/bun/sqlite.ts deferred/immediate/savepoint wrappers were rechecked; fresh runtime probes confirm Bun 1.4.4 and SQLite 3.53.4. Temporary Gitleaks was re-downloaded after session temporary storage was cleared; official 8.30.1 checksum again matches the pinned Linux x64 archive digest 551f6fc83ea457d62a0d98237cbad105af8d557003051f41f3e7ca7b3f2470eb.

3. Architecture & File Manifest

File Responsibility
src/policy.ts Pure deny-wins rule matching, workspace-relative path invariant, risk scoring defaults, exported policy types/config
src/store.ts authorize orchestration, lease check reuse, grants, budgets/usage/retry draws, policy/budget audit rows, per-dispatch relay gate
src/index.ts Export new policy/budget/grant/effect-gate types and seams
tests/policy-corpus.test.ts Policy decision table, path/compound-shell adversarial cases, risk terms, grants, deadlines, budgets, audits
tests/fixtures/relay-policy.ts Explicit synthetic ACL, root/deadline and meter-only call-budget fixture shared by relay regressions
tests/outbox.test.ts Explicit policy for relay; per-dispatch denial/cap regressions
tests/write-gate.test.ts, tests/kill.test.ts Preserve T-02/T-05 behavior; prove bookkeeping gate remains separate
SPEC.md, ROADMAP.md, decisions.md Authority, contract, evidence
research/reviews/2026-10-24-p1-t06*.md Access record, preserved initial advisory and corrected-artifact re-review; human disposition separate

Callers traced: writeGate serves transition/lease admission; relayBatch is the only native dispatch loop and currently calls writeGate per item; openAction/recordVerdict/recordFinish own action-history transitions. authorize uses the existing audit lifecycle via its private row inserter so a kill denial can still be recorded as a terminal policy event. Existing v4 budgets/usage/grants tables are unexercised by earlier native APIs; no migration.

EffectRequest carries a required context, tool, 1–100 targets, target type (path/command/domain/opaque), absolute deadline and optional parent deadline, root-or-grant authority, tier, action class and trusted production/data-egress flags. These are host classifications, not model claims or authentication. RelayPolicy extends ACL config with deadline/parent deadline/authority; relayBatch(db, context, policy, adapter, limit?) is the exact new signature. The fixed synthetic adapter identity still cannot name a production target.

setBudgetLimit explicitly configures a run/kind (null means meter-only); missing tool-call/draw configuration is an error, never a permissive default. getBudget reads counter+usage in one short snapshot and checks agreement. drawBudget atomically reserves without recording denied spend; recordUsage always records actual spend, including after kill/overage. Once present, token/ minor-unit caps at or above the limit block subsequent effect admission. Cost budgets are optional until explicitly configured; no cost measurement or pricing is inferred from a synthetic call. threads draws are cumulative reservations, not a live-thread count. drawRetry requires safe transient classification and configured call/retry rows: capacity=max(10,floor(total calls/5)), consumed draws expire after 60 seconds. Static explicit retry caps also apply.

Policy decisions have their own UUID audit action, separate from effect history. A completed policy:<target-digest> action means the decision was recorded, never that the effect executed. Every synthetic allow is logged (including reads) to support recorded novelty. Only prior allowed decisions remove novelty; an ask cannot silently downgrade itself on retry. Pending asks need separate human disposition and do not create reusable approval tokens. Network egress has an unoverridable ask/high-risk floor. Risk weights/thresholds are fixed R-20 defaults in this slice; session decay/calibration and CLI configuration are later work.

4. Test Plan & Coverage Matrix

  • Unit/policy table: exact/wildcard anchored matching; global/run/thread specificity; deny-wins; defaults ask/deny; compound shell allow suppression; ../absolute escape and secret-adjacent denial; default policy.
  • Risk table: tier, outside/secrets/prod/egress/fan-out/novelty/prior-deny/ irreversibility terms; 0–100 cap; escalate-40/block-75 decisions.
  • authorize: allow, ask, deny, kill, expired/inherited deadline, missing/ expired/mismatched grant, valid narrowing grant, invalid/expired lease, budget cap, meter-only, audit sequence and no raw target in evidence.
  • Budgets/grants: limit upsert/read, atomic draw, over-cap denial, post-spend usage recording, retry bucket capacity/expiry, grant creation audit, malformed input and rollback.
  • Relay: explicit policy required; allow dispatches once; deny/ask/budget breach prevents adapter call; per-item recomputation; kill mid-batch; existing outbox replay/cursor/unknown contracts retained.
  • Process: two real subprocesses race one capped draw against a file DB; exactly one succeeds, usage/counter agree, no overdraw; failure output sanitized.
  • Regression: T-02 writeGate still kill→lease; T-05 kill/reset/CLI status unchanged; outbox tests updated only for the explicit policy argument.

SQL is used only in fixtures/history assertions; behavior goes through public APIs. Required coverage must not fall below the 100% functions/95.78% lines baseline; focused policy/outbox/kill tests must pass repeatedly.

5. Security, Observability & Edge Cases

  • Mechanical path invariant: normalize workspace-relative paths; deny .. or absolute escape before policy; deny .env/key/DB-like secrets; symlink physical resolution remains supervisor/adapter-owned and is documented.
  • Commands: exact/wildcard target patterns; any shell control operator removes allow eligibility, so git * cannot authorize git status && rm.
  • Grants are scoped run/thread/tool/pattern, expire, never widen policy, and are minted with an audit row. Direct host SQL remains trusted; API inserts only.
  • Deadlines are absolute and child ≤ parent; expired requests deny. Lease checks use the existing owner/epoch/run/expiry rules. Kill remains first and human- attributed; no automatic budget kill.
  • Every ask/deny writes request+verdict audit rows; synthetic allows write decision completion too. Evidence carries score/breakdown/reason, never raw targets or secrets. Budget crossings write budget-breach audit actions with kind/counter evidence.
  • Fail closed on malformed context/config, absent cap row (meter-only only when explicitly unset), malformed stored counters/grants, duplicate grants, invalid budget arithmetic and adapter outcomes. No fallback allow, provider login, network call or real effect.

6. Blast Radius & Rollback Plan

Additive API and one explicit relay signature change (policy required before adapter and limit). Existing callers/tests must pass policy; no default permissive policy is injected. No schema or migration change; budgets/usage/grants are existing v4 tables. Synthetic tests use throwaway file/:memory: DBs and /tmp/opencode; no repo DB, credentials, provider state or production path. Rollback is reverting the T-06 source/test/export/docs diff; v4 data remains compatible and idle. Residual risk: trusted host SQL/clock/context/evidence, lexical-only symlink handling, in-flight actions after kill, unresolved ask rows blocking reset until resolved, cumulative threads draw (live release deferred), and no production containment/identity/restore qualification.

7. Definition of Done (DoD)

Run in order and record exact results:

bun run lint
bun run check
bun test --coverage
bun test tests/policy-corpus.test.ts tests/outbox.test.ts tests/write-gate.test.ts tests/kill.test.ts
bun audit

Also run the fixed-artifact ishan-reviewer on the final candidate, persist the report under research/reviews/, run trusted Gitleaks scans on task files, the SPEC document validator, git diff --check and a protected-file review. Required checks must pass; unavailable checks block. Human disposition remains separate. No commit/push is implied by this contract; commit only on explicit instruction.

Execution evidence (2026-10-24):

  • Initial public acceptance red: bun test tests/policy-corpus.test.ts exit1, six failures because the new public APIs were absent (not an import failure). The inherited draft pure evaluator existed before acceptance tests; no claim that those draft lines were written test-first. New gate/budget behavior was added after the public acceptance red.
  • Focused regression reds reproduced novelty ask→allow, stale pre-lock clock, split-snapshot budget status, over-cap continued admission, relay lease before deadline, wildcard compound shell/secret near-misses, grant binding corruption and retry timestamp-zero exhaustion. Each now passes via the public seams.
  • Final ordered checks: bun run lint exit0 (20 files), bun run check exit0, bun test --coverage exit0 (108 tests/1895 assertions; functions100%, lines97.06%; store99.78%, policy98.00%, framework87.50%, index100%). Aggregate lines exceed the95.78% baseline and functions remain100%; store's99.85% baseline versus99.78% now reflects added guards, not removed safety tests. Fixture coverage is reported separately by Bun and included in its aggregate.
  • Exact declared focused command passes three consecutive runs:78 tests/ 1618 assertions each. Includes real process draw contention, deadline lock wait, concurrent snapshot status and prior crash/recovery regressions.
  • bun audit exit0:14 packages, no advisories; not a full security/license assessment. Ten scoped task files pass verified Gitleaks8.30.1 scans (exit0, no findings); the document validator passes277 links/seven active sections/ unique ADR IDs/casing/whitespace. Schema/migration source and protected dependency/config/CLI/framework files match aa4872b; git diff --check exits0. Advisory persistence and final report scanning remain closeout checks, not implied by passing application tests.
  • A strict-typecheck failure from an overly broad subprocess test handle and a recursive fault-trigger fixture were corrected in tests. Gates restarted from lint; earlier failed runs are not relabelled as passing evidence.
  • Initial fixed-artifact advisory T06-20261024-01-AI-02 requests R-001 (literal-star wildcard deny bypass), R-002 (SQLite sidecars not classified as DB secrets) and R-003 (call-cap check follows lease). Reports preserved under research/reviews/2026-10-24-p1-t06-initial.md and the separate access-only record. Remediation requires public failing regressions, ordered gates and a new fixed candidate/re-review; existing passing gates do not waive findings.
  • Corrected candidate: bun test tests/policy-corpus.test.ts -t 'R-00' first failed four intended regressions; a separate R-001 public admission red returned allow under a wildcard deny. Shared matcher now treats * before literal equality; DB classifier denies SQLite -wal/-shm/-journal companions; shared budget-state precheck runs before lease without consuming usage, while the atomic draw remains after lease. All four regressions now pass (40 assertions). No waiver or scope change.
  • Corrected ordered gates exit0: lint20 files; strict check;112 tests/1935 assertions,100% functions/97.04% lines (store99.68%, policy98.00%); declared focused82 tests/1658 assertions pass three consecutive runs; audit14 packages/ no advisories. Baseline100% functions/95.78% lines remains exceeded overall; new defensive rejection branches are reported uncovered, not omitted.
  • Workspace review copies interfere with repository-wide formatter discovery. A lint attempt failed on copied manifest indentation; owned copy was removed only after byte-matching its preserved archive, then gates restarted. No lint exclusion/config change, source rewrite or skipped safety test was used.
  • Corrected T-06 advisory, review T06-20261024-02-AI-01, marks R-001–R-003 resolved, no new/open confirmed finding, READY FOR HUMAN REVIEW. Base aa4872b5acbcd92b93ef1c62c13a774d4f0915d9 plus immutable overlay T06-20261024-02, manifest SHA256 546f9f058458c648bd40190279a2eb98a8ba3c56a48e71e0c358e924ff8916df; pre-approval report SHA256 40ad3bbcafd10677e257234b37103327df796606e6bd643d10e202e12367aad1. Reviewed source/test/fixture hashes match current files; read-only workspace copy removed after byte-match to preserved temporary archive. Initial substantive report remains unchanged. Human disposition/commit/push and any later-slice/provider/production authority remain pending, not inferred.
  • Final post-persistence checks: declared ordered gates pass again (112 tests/ 1935 assertions; focused82/1658; audit clean). All13 task files, including three review records, pass verified Gitleaks8.30.1 scans; document validator passes279 local links/seven active sections/unique ADRs/casing/whitespace. Report/source/test/fixture hashes match the corrected artifact; no review copies remain in the task diff. Schema/protected-file and git diff --check comparisons pass. These are parent-executed hygiene/correctness checks, not independent human sign-off or production qualification. No commit/push or T-07 advancement performed; await Ishan disposition and owner instruction.
  • Approval record (2026-10-24): owner stated “Approved by Ishan, commit” after the corrected T-06 handoff. Approval applies to overlay T06-20261024-02 and its recorded manifest; R-001–R-003 remain resolved. This is owner-relayed approval, not a direct signature or independently verified identity. Fresh pre-commit lint/strict check,112 tests/1935 assertions (100% functions/97.04% lines), focused82/1658 and dependency audit pass; reviewed source/test/fixture hashes remain unchanged. Appended report approval and governance records are the only post-review disposition changes. Approval-appended report SHA256: 5bdc73fa0da1dba40c2e5e77a9800b8f43f16d4de52daff31637a06612ff7e71. Commit authorized for T-06 only; no T-07 continuation, push, G1 closure, production/provider use or real effects.
  • Approval-closeout checks:13 verified Gitleaks scans pass, including the appended approval records;279-link document/structure validator and protected files/whitespace checks pass. Pre-approval advisory bytes are unchanged; only the attributed approval appendix was added to the final report.
  • Owner continuation (2026-10-24): T-06 committed as 9f3241a; owner subsequently requested “push and continue”. Push of feat/p1-policy to configured origin failed (exit128): Permission denied (publickey); the SSH askpass executable was also unavailable. No successful publication is claimed. Remote/credentials were not changed or inspected. Next owner: repository owner restores authorized SSH access before a push retry. Local T-07 discovery began on clean feat/p1-cli-conformance from 9f3241a; public/security seams require confirmation before its active contract and application/test changes. No provider/real effect or G1 closure authorized.
  • T-07 discovery: current init/re-init both exit0, missing-DB status creates a database, and check-framework exits0 despite the configured framework sibling being at4.0.0 rather than pinned2.1.0. All reproduction state was throwaway. Pinned Git-object sources, not sibling working files, define the expected skill-lock/hash contract; no sibling edits, install or re-pin. Fresh baseline lint/strict check/112-test coverage and dependency audit pass (1935 assertions;100% functions/97.04% lines;14 packages/no advisories).

T-05 completed execution record (historical)

  • Work package: P1 / T-05 synthetic kill engage/reset, started 2026-10-24.
  • Authority: owner requested “commit and continue”; confirmed scoped v4 binding/history migration, guarded synthetic reset and public test seams.
  • Baseline/branch: clean 08292d9, feat/p1-kill-switch; T-02/T-04 approved as relayed by owner. No push/production/provider/next-slice authority.
  • Status: implementation, ordered code gates and fixed-artifact re-review verified; T-05 approved by Ishan as relayed by the owner and committed in f955622. T-06 contract/discovery authorized by “commit and continue”. G0 closed, G1 open.

1. Phase Objective & Scope

Atomic global/per-run admission stop: revoke scoped leases, latch kill, deny only undispatched native approvals/actions, cancel linked undispatched intents and halt relay through its existing live gate. Keep admitted effects unresolved/observable. Separate fresh-plan synthetic reset, never automatic re-grants/resurrection. Add kill state to CLI status, but no CLI engage/reset command (T-07). Production identity/transport, execution cleanup, providers, full policy and G1 closure remain unqualified. This is trusted-host synthetic control, not runtime containment.

2. Environment & Upstream State

Fresh clean baseline: lint exit0 (16 files), strict check exit0, full coverage exit0 (60 tests/555 assertions; functions100%, lines95.76%, store99.78%, framework 87.50%, index100%), audit exit0 (14 packages/no advisories). Bun1.4.4/SQLite3.53.4; no runtime/dependency upgrade. Reuse verified synchronous immediate/savepoint and WAL/FULL behavior; never await under a DB writer lock. R-17 is design context, not proof of implemented containment. Gitleaks8.30.1 remains temporary, pinned archive digest/executable must be verified before scans. Installed Bun transaction declarations and official bun-v1.4.4/src/js/bun/sqlite.ts controller/wrapper source rechecked against the unchanged runtime; fresh SELECT sqlite_version() confirms3.53.4. Default read snapshots, immediate writers and rollback/savepoint behavior are exercised by the current corpus, not assumed from current upstream main.

3. Architecture & File Manifest

File Responsibility
src/store.ts Exact v4 migration, persisted lease run binding, immutable control triples/denials, engage/status/reset plan/reset, audit/outbox cancellation integration
src/index.ts Export kill types/seams, retain existing normal APIs
src/cli.ts Show global/run kill state in status JSON; no critical operator command
tests/kill.test.ts Owner-confirmed control/gate/lease/audit/outbox/status and process seams
tests/fixtures/schema-v3.sql Independent additive v3 DDL snapshot layered over known-v2 fixture
tests/schema-v2.test.ts, tests/write-gate.test.ts, tests/outbox.test.ts Advance current version; explicit column fixtures/run identities, preserve substantive assertions
SPEC.md, ROADMAP.md, decisions.md Scoped authority/contract/evidence
research/reviews/2026-10-24-p1-t05.md Fixed-artifact advisory, human disposition separate

Callers traced: isKilled serves writeGate/acquisition; no engage/reset exists. leases omit persisted run; audit forbids second verdict; outbox lacks cancelled projection. Address those owners once rather than inventing identities, revoking unrelated runs or treating admitted work as not-executed. Existing v2/v3 DDL, facts and immutable guards preserved; v4 is additive and versioned atomically.

Exact interface/invariants:

  • scope is exactly global or run:; no thread/prefix matching. Kill operations require explicit synthetic:true, human: actor, bounded reason and evidenceRef. Trusted host must establish actual human authority; syntax and fixture flag do not authenticate a human or qualify production operations.
  • v4 adds nullable leases.run_id, nullable kills.event_id, immutable kill_events and kill_denials. Unknown legacy lease-run/latch identities stay NULL; don't fabricate authority. Native acquisition binds run; live same-owner renewal must match run. Unknown/cross-run bindings cannot authorize/renew native writes; trusted cleanup or expiry then fresh acquisition increments epoch normally.
  • Kill events are a dedicated critical control audit: three immutable rows per operation (requested → allowed → completed), one operation UUID, matching scope/ actor/reason/evidence, ordered IDs. Completed means its whole local transaction committed, not process containment. Global controls use explicit global scope, never fabricated run/thread identities. Legacy latch adoption preserves prior latch values in immutable command evidence before establishing native history.
  • engageKill(db,{scope,actor,reason,evidenceRef,synthetic:true}) requires no caller transaction and executes one immediate transaction. Idempotent while the native latch remains active; repeated engage returns original latch, not changed reason. A legacy flag may be re-engaged to establish audited native state, never silently reset. Validate scoped histories before committing; any error rolls back the complete local operation and must not be reported as successful kill.
  • Revoke all scoped bound lease rows (global includes unknown legacy rows): expire to0, increment healthy safe epoch. Invalid/exhausted epochs remain ungrantable, expired, and reported; never overflow/repair them into valid authority. Run kill does not modify unrelated bound leases; unknown run leases already cannot admit.
  • Freeze pending/escalated/allowed unresolved native actions only when NO outbox dispatch attempt was EVER admitted. Append denied/not-executed with kill actor and immutable kill-event evidence. Only private kill-denial path permits this allowed→denied exception; ordinary recordVerdict still rejects duplicate verdicts. Readers verify the immutable kill link and scope; resetting a latch does not invalidate historical proof. Any admitted attempt, even later not-applied, remains excluded from this automatic non-execution inference.
  • Outbox derives cancelled only from a verified linked kill denial and zero attempts; malformed contradictions fail closed. Intent/events stay immutable. Cancelled intents remain queryable but not unresolved relay work; resetting never resurrects them. New native requests/allow/escalation during kill reject; finish and reconciliation remain recordable for already admitted facts.
  • getKillStatus(db,runId?) reports global/run latch and blocked flag; validates native control triple/reference, distinguishes legacy flag without audit. Gate continues presence-based fail-closed denial, even malformed descriptive data. Both scope reads share one short synchronous SQLite snapshot, never mixed states. CLI status includes kill state before transition fields, including no-transition response. Host CLI is not a replacement for T-07 trusted critical controls.
  • prepareKillReset(db,{scope}) requires active native latch; returns exact triage snapshot/digest: in-scope native action heads, all outbox intents/attempts (including unknown attempts behind an applied intent), leases, relevant latch/ control state. Identify cancelled undispatched work separately from unresolved admitted effects. Block reset on non-terminal native actions or unresolved admitted attempts. Unknown legacy claims remain visible as unattributed history, never invented dispatch proof. No exposure of raw secrets or credential stores.
  • resetKill(db,{scope,actor,reason,evidenceRef,cleanupEvidenceRef,snapshotHash, synthetic:true}) refuses caller transactions, non-human syntax, missing evidence, stale plan, unresolved native work or legacy/unbound latch. In one immediate transaction recompute exact plan, record a separate critical control triple and clear ONLY that latch. Cleanup/refreshed verification evidence is trusted host attestation for disposable fixtures, not independently proven containment. Concurrent observations/changes invalidate old plans; no network verification under lock. Fresh preparation after reconciliation required.
  • Reset never restores epochs, leases, approvals or intents. Another active kill scope still blocks. Lease acquisition/cleanup and late facts remain their explicit host-bookkeeping exceptions. Full operator identity, real cleanup and production reset qualification stay later gates, not replaced by a Boolean or actor string.

4. Test Plan & Coverage Matrix

Confirmed engageKill/prepareKillReset/resetKill/getKillStatus plus gate, lease, audit/outbox APIs and CLI status. SQL only migration/malformed/kill fixtures and history assertions; actual processes for restart/contention, no private mocks.

Scenario Required proof
Migration/binding Known v3 preserved, NULL legacy run stays unknown, current v4 registry/guards exact and atomic
Scoped kill Global/run latch + epoch expiry + undispatched denial/cancel commit together; unrelated run unaffected
In-flight honesty Kill between batch items blocks later dispatch; late results preserved, admitted actions never denied/not-executed
History Immutable critical triples/denial links, duplicate ordinary verdict still rejected, historical links survive reset
Admission Kill denies new requests/allowances/renewal/writes; scoped live run binding enforced; cleanup/late evidence available
Reset Fresh snapshot and host human evidence required; stale/unresolved/legacy plans reject; no re-grants/resurrection
Failure/recovery Throw/lock/corruption leaves atomic state, reopen retains latch and revoked epochs, competing engage/reset serialize
CLI/compatibility Status shows kill even without transitions; old data/guards preserved, fixture adaptations explicit

Test-first vertical slices, owned disposable state under /tmp/opencode; no real effects/provider calls or invented human/environment verification.

5. Security, Observability & Edge Cases

Parameterized SQL, bounded runtime context/evidence, no raw input/row/error dumps. Only trusted host calls critical functions; executable agents/production channels remain disabled. Kill is local admission closure, not rollback or proof a process stopped. Invalid storage/history can fail the whole operation: report explicit failure/escalate rather than claim partial success. Exhausted/invalid leases are expired but not repaired/re-granted. No silent reset, trigger bypass, audit deletion, fabricated legacy identities or universal cleanup/latency guarantee.

6. Blast Radius & Rollback Plan

Additive v4: old binaries refuse; migration preserves existing rows/DDL. New binding invalidates unknown legacy native-write authority intentionally; operator must release/expire and reacquire. Kill-specific cancellation is terminal; use new action/intent after reset, never rewrite history. Rollback only via verified backup restore to separate disposable state with post-migration facts retained for triage; no downgrade/delete path. No production migration/backup/restore authorized.

7. Definition of Done (DoD)

bun run lint → bun run check → bun test --coverage → bun test tests/kill.test.ts → bun audit → verified task-file Gitleaks scans, all exit0. Compare fresh 60-test/95.76% baseline and per-file functions/lines; preserve all substantive regressions, no skipped/suppressed coverage. Historical document-validator heredoc, git diff --check, protected package/lock/config/pins/ .github/.opencode/prior-review comparisons pass. Review exact fixed candidate with ishan-reviewer, persist evidence/report, human approval separate. Leave T-05 uncommitted unless requested; no push/live effects/providers/G1 closure/next slice.

Execution evidence (2026-10-24, Bun1.4.4 / SQLite3.53.4):

  • Observed intended reds before implementation: intact v3 remained3; cross-run writer accepted same lease; missing engage/status and prepare/reset exports; kill left undispatched approvals pending; CLI omitted kill state. Each seam implemented after its acceptance failure, not fixtures/import failures.
  • Additional public red: orphan outbox observation did not invalidate historical kill non-execution proof. Any outbox event now refutes automatic non-execution, including malformed orphan evidence; shared action-history validation owns this proof and outbox cancellation reuses it instead of duplicating impossible guards.
  • Status stress at public getKillStatus found210 false clears while an atomic legacy scope-switch fixture always retained one kill. One short read transaction fixes mixed global/run snapshots; the regression runs1000 fixture flips/100000 reads, with no false clears. An earlier larger native-control stress probe hit the default5s fixture timeout; minimized to this bounded direct status fixture, removed its owned leftover state, and did not raise timeouts or skip safety tests.
  • Crash/reset process fixture initially hit SQLITE_BUSY_RECOVERY during concurrent connection setup, before reset. Captured cause, staged participant opens before the readiness barrier, then raced real reset calls; no retry loop or new runtime assumption added to application code. Ordinary SQLite busy remains caller-owned.
  • Final bun run lint: exit0 (17 files); bun run check: exit0; bun test --coverage: exit0,82 tests/697 assertions,100% functions,95.78% lines (baseline95.76%); store99.85% (99.78%), framework87.50% and index100% unchanged. Prior60 tests retained; current-version/column fixtures explicitly updated forv4.
  • bun test tests/kill.test.ts: exit0,22 tests/142 assertions; three consecutive focused runs pass. Covers v3 preservation, binding, global/run scope, immutable triples/denials, any-admission exclusion, late facts, cancellation, unresolved attempts behind applied intents, stale reset digest, no re-grants/resurrection, corrupt history, SQL fault rollback, CLI status, abrupt exit and competing resets.
  • bun audit: exit0,14 packages/no advisories; no install/upgrade/auto-fix.
  • Verified Gitleaks8.30.1 archive digest 551f6fc83ea457d62a0d98237cbad105af8d557003051f41f3e7ca7b3f2470eb and executable bytes before task-file scans. Exact command pattern: env -i PATH=/usr/bin:/bin <verified-gitleaks> dir <file> --no-banner --redact=100 --ignore-gitleaks-allow --gitleaks-ignore-path /tmp/opencode/loom-t01-no-ignore. Task-file scans clean; final review/governance edits require rescan.
  • Document-validator/protected-file/whitespace checks pass. No real operator authentication, execution-domain containment/cleanup, provider, production restore, timeout/power-loss guarantee, full policy or G1 closure claimed.
  • Additional revocation reds: a NULL-key legacy lease was skipped by per-key equality UPDATE, and an ignored UPDATE still reported success. One scope-wide parameterized UPDATE now handles NULL keys without guessing identities; verify matched row count or roll back the complete control operation. Final ordered gates restarted and pass: lint17 files, strict check,84 tests/702 assertions, 100% functions/95.78% overall lines/store99.85%; focused24 tests/147 assertions pass three consecutive runs; audit14 packages/no advisories. Earlier82-test evidence is historical, not substituted for this corrected-candidate proof.
  • Initial T-05 advisory requested R-001: ignored kill-denial link INSERT could commit incomplete history. Its adjacent question about ignored legacy-latch adoption was also reproduced. Exact red command bun test tests/kill.test.ts -t "ignored kill-denial|ignored legacy latch" produced2 false-success failures. Both writes now require exactly one changed row; engagement also verifies the persisted latch points to its own completed control event. Public regressions assert complete rollback of lease/action/ intent/latch/control history, including dropped-reference fault after upsert.
  • Corrected ordered gates pass: lint17 files, strict check,86 tests/719 assertions, 100% functions/95.78% lines/store99.85%; focused26 tests/164 assertions pass three consecutive runs; audit14 packages/no advisories. Original84-test advisory snapshot preserved.
  • Corrected T-05 re-review (report SHA-256 69921687f9c33340b389b0a56178e281592bb7df81f4618c5f8ad04c6263690d) marks R-001 and the adjacent legacy-latch question resolved, with no open confirmed finding. Reviewed source/test/fixture hashes matched current files; the uncommitted candidate snapshot was removed after its archive matched. Report persistence changed only one Markdown hard-break trailing space; the appended approval record changes only disposition/authority text.
  • Approval record (2026-10-24): owner stated “approved by Ishan, commit and continue” after the candidate handoff. T-05 implementation/re-review committed as f955622bf1c277bd914b1e738a28a5475164cb9d; this is owner-relayed approval, not a direct signature or independent identity verification. It closes T-05 only, not G1. The same instruction authorizes T-06 contract/discovery and synthetic implementation, subject to confirmed public/security seams. No push, production/provider use or real effects authorized.
  • T-05 closeout checks: all13 task-file scans with the verified Gitleaks binary exit0/clean; historical document validator passes (277 links, seven active sections, unique ADRs/casing/whitespace); git diff --check and protected-file comparison exit0. These establish documentation hygiene only, not production identity, containment, restore or provider qualification.

T-04 completed execution record (historical)

The approved T-04 implementation below is d0a02dd, approval closeout 08292d9; current T-05 contract above governs the additive kill/binding/cancellation changes.

  • Work package: P1 / T-04 synthetic outbox, started 2026-10-24.
  • Authority: “commit and continue”; owner confirmed synthetic v3 migration, immutable intent binding, conservative replay and public test seams.
  • Baseline/branch: clean 39cb915, feat/p1-outbox. T-02 was pending at slice start; owner subsequently relayed Ishan's approval, recorded below.
  • Status: implementation and ordered code gates verified; fixed-artifact AI re-review has no open confirmed findings. T-04 approved by Ishan as relayed by the owner after commit d0a02dd; T-02 also approved through the owner. G0 closed, G1 open. No live effects/providers.

1. Phase Objective & Scope

Durably bind business progress to synthetic effect intent, admit each dispatch through the live T-02 gate and preserve uncertain outcomes across restart. Add atomic schema v3 migration; preserve v2 ledger/audit/lease data and guards. Only disposable fixture adapters/targets; no CLI dispatch, production integration, provider/network calls, complete policy, kill actuation or later slice. Audit outcomes and outbox observations remain facts, never proof of task completion.

2. Environment & Upstream State

Fresh pre-commit baseline on 2026-10-24: lint 15 files, strict check, 45-test full coverage (421 assertions), focused gate 15 tests/144 assertions and dependency audit 14 packages all exit 0. Functions 100%, overall lines 95.71%, store 99.63%, framework 87.50%, index 100%. Bun 1.4.4/SQLite 3.53.4 unchanged. Installed and official Bun 1.4.4 immediate/savepoint behavior revalidated in T-02; SQLite cannot atomically cancel an external effect. R-06/R-17 are design context, not new proof. No install/upgrade. Trusted temporary Gitleaks remains available; verify before use.

3. Architecture & File Manifest

File Responsibility
src/store.ts Exact v2/v3 recognition and atomic migration, immutable intent/event persistence, queries, relay/reconciliation
src/index.ts Export new outbox types/functions, preserve gated APIs
tests/outbox.test.ts Confirmed public seams, independent fixture targets, recovery/contention and state regressions
tests/fixtures/schema-v2.sql Independent known-v2 DDL snapshot for migration regression
tests/schema-v2.test.ts Retain original migration/guard checks while advancing expected current version to 3
SPEC.md, ROADMAP.md, decisions.md Contract, migration/replay decisions and evidence
research/reviews/2026-10-24-p1-t04.md Fixed-artifact AI advisory; Ishan disposition separate

Callers traced: no existing outbox caller/table. Gate and audit functions are reused as-is; CLI stays without relay/effect commands. v2 schema DDL and previous records stay intact; v3 adds outbox intents, append-only dispatch/observation events and scoped monotonic cursor. No event-range retirement or guard bypass.

Exact contract:

  • enqueueOutbox(db,ctx,args) requires an active caller transaction; caller uses the same immediate transaction as recordTransition. It rechecks gate and native action's allowed/pending state. No arbitrary business-write callback or implicit independent commit. Tests prove business/intent rollback together.
  • Intent has canonical UUID intentId and native actionId, ctx run/thread/workspace, fixture-only kind/target identities, exact bounded JSON payload string and its SHA-256, and replay mode idempotent/reconcile. Exact bytes are binding, not a lossy JSON normalization. One intent per native action in a run. Same intent retries return the original row only if every bound field matches; otherwise reject. SQLite row ID orders records, never serves as a global target dedup key.
  • Intent and event rows are immutable by triggers. Each dispatch admission mints a UUID attemptId and captures owner/epoch in the gate's transaction. Observation events refer to that original attempt; late applied/unknown facts remain attributable after kill or lease succession, without granting a stale write.
  • getOutbox(db,intentId) returns validated intent, attempts and derived state; NULL only for genuine absence. listUnresolvedOutbox(db,{runId,threadId?,workspace?}) returns pending/dispatched/unknown work in ID order. Malformed payload/hash, event/identity/history fails explicitly, never falls back to prior success.
  • Projection: no attempts or all proven not-applied ⇒ pending; admission with no observation ⇒ dispatched; unknown observation ⇒ unknown; any proven applied attempt ⇒ applied and never dispatch again. Applied/not-applied observations for an attempt are terminal; unknown may be resolved with evidence. No callback exception is evidence of no effect.
  • relayBatch(db,ctx,adapter,limit=10) refuses caller transactions (no async effect inside an outer DB lock), accepts integer limit 1–100, and reads a bounded ID-ordered snapshot of unresolved matching fixture work. Adapter explicitly identifies synthetic kind/target and replay mode. Scoped histories are validated linearly before the bounded dispatch selection; no indexed projection yet. No default production adapter, path/network resolver, dynamic module loading or CLI dispatcher.
  • For EACH item, reacquire an immediate transaction, recheck gate, exact intent/ action and current outcome, append dispatch attempt and advance scoped cursor; commit BEFORE invoking the adapter. No DB lock/long-lived reader across awaits. Cursor is a monotonic admitted high-water mark, NOT an applied cursor and NEVER excludes older unresolved work from recovery scans. No generic async transaction.
  • Dispatch admission is the local linearization point. Kill committed before it denies; an admitted operation may reach/finish at the target after kill. Mark that uncertainty honestly; SQLite cannot close the external handoff gap. Check kill/epoch again for subsequent items, never relabel admitted work not-executed.
  • Adapter receives exact stored intent bytes, hash, stable intentId dedup key and attemptId; result is applied/unknown plus bounded evidenceRef. Throwing or invalid result records unknown with safe synthetic evidence, without logging raw errors. Applied evidence is target observation, not independent workflow verification.
  • Previously admitted idempotent work may retry only against a matching explicit deduplication contract; fixture target must persist stable-key/exact-payload deduplication independently from Loom. Concurrent admitted replays can call it more than once but may apply only once. No exactly-once guarantee for arbitrary targets or from the Loom marker alone.
  • Non-idempotent admitted/unknown work is never automatically replayed. Trusted reconcileOutbox(db,{intentId,attemptId,outcome,actor,evidenceRef}) records applied/not-applied/unknown observation. Explicit host human attribution and evidence required; syntax isn't authentication. A new attempt requires proof all previous attempts were not applied. Reconciliation is bookkeeping permitted after kill/expiry; it cannot dispatch, clear kill, grant a lease or erase history.
  • Relay observations are tied to the admitted attempt, not a current lease; kill and expiry cannot suppress a late result. Do not auto-rewrite audit decisions or outcomes; the native action and outbox intent remain linked for operator triage.
  • v3 migrates intact empty/legacy/v2 stores atomically through the recognized versions; migration registry is exactly [2,3] with timestamps. Unknown/drifted/ partial/future layouts refuse before changes. Preserve existing fields, guards, durability read-back and NULL legacy identity. No down-migration/data deletion.

4. Test Plan & Coverage Matrix

Owner-confirmed enqueue/get/list/relay/reconcile, gate/audit/transition and initSchema seams; SQL only migration snapshots, malformed/kill fixtures and history assertions. Real fixture adapters, target state independent of Loom; no private mocks.

Scenario Required proof
Migration Known v2 data/guards preserved, registry3 idempotent; unknown/partial/failed migrations unchanged
Atomic intent Gate/action required, shared business rollback, exact duplicate vs rebound rejection
Projection Immutable intent/events, validated payload/hash/history, ordered unresolved reads
Relay Gate per item, no DB transaction while awaiting target, kill/epoch between items blocks later admission
Uncertainty Target exception/malformed result stays unknown; late result after kill/succession attributed to original attempt
Replay Crash between target and marker deduplicates at independent target; non-idempotent refuses until evidence-backed reconciliation
Recovery/contention Cursor survives reopen without skipping old uncertainty; concurrent relays cannot double-apply fixture target
Compatibility Existing gate/audit/CLI tests retained; schema expectations advanced, no dependency/runtime/authority enablement

Test-first vertical slices, disposable owned state under /tmp/opencode, no real secrets/customer data. Observe intended reds before application changes.

5. Security, Observability & Edge Cases

Trusted host caller/adapter, never runner-provided authority. Fixture-only identity validation cannot sandbox malicious host callbacks; production qualification is separate and no real adapter is supplied. Bound inputs, parameterize SQL, redact errors/evidence, never dereference evidence. Audit lifecycle and outbox append-only guards stay intact. No network waits in writer transactions, long-lived WAL reader, blind retry, raw error dump or unknown-as-success inference. Deadline/grant/policy remain required before production effects; no permissive placeholder implements them.

6. Blast Radius & Rollback Plan

New opt-in store exports and additive schema v3; old v2 binaries will refuse v3. Rollback is reviewed code plus verified pre-migration backup restore to a separate disposable DB, not DROP/DELETE/downgrade. Never erase post-migration intent or effect observations to manufacture rollback. Tests use known-v2 SQL fixtures; production migration, backup destination/restore qualification remain unauthorized.

7. Definition of Done (DoD)

bun run lint → bun run check → bun test --coverage → bun test tests/outbox.test.ts → bun audit → verified trusted changed-file secret scan, all exit 0. Compare fresh 45-test/95.71% baseline and per-file coverage; preserve assertions, no skip/exclusion. Historical document-validator heredoc, git diff --check, protected package/lock/config/pin/.github/.opencode and previous review/gate/audit/smoke comparisons pass. Review fixed candidate with ishan-reviewer and persist advisory, exact identity/proof/limits; Ishan disposition separate. Leave T-04 uncommitted unless separately requested. No push, provider, real effect, G1 closure or advancement beyond this slice.

Execution evidence (2026-10-24, Bun 1.4.4 / SQLite 3.53.4):

  • Observed intended behavioral reds before implementation: intact v2 stayed at version2 instead of3; missing enqueueOutbox, relayBatch and reconcileOutbox. Each seam then implemented with its acceptance test; later adversarial/recovery tests exercise those paths rather than claiming additional behavioral reds.
  • bun run lint: exit 0, 16 files; bun run check: exit 0.
  • bun test --coverage: exit 0, 59 tests/551 assertions, 100% functions, 95.76% lines (baseline 95.71%); store 99.78% (99.63%), framework unchanged 87.50%, index unchanged 100%. Prior 45 tests retained; only schema-current expectations/registry corruption fixture advanced to v3. No exclusions/skips.
  • bun test tests/outbox.test.ts: exit 0, 14 tests/130 assertions. Independent v2 SQL snapshot recognized; migration preserves facts/guards; competing writer leaves v2 intact and retry succeeds. Existing disk-full/unknown-layout migration regressions remain green. Caller rollback, exact intent binding, append-only guards, malformed history/output/cursor and invalid shape/adapter tests pass.
  • Gate checked between batch items: kill or lease succession blocks next item, while late applied result stays bound to original owner/epoch/attempt. Cursor high-water never suppresses older unresolved work. Non-idempotent unknowns refuse replay until evidence-backed reconciliation; terminal conflicts reject.
  • Separate target SQLite commits before child exits23 without a Loom marker; reopen sees dispatched uncertainty, replay uses stable key and exact payload with target-side dedup, applies once. Overlapping batches preserve both attempts and skip already-applied candidates. Two real non-idempotent relay processes synchronize on readiness pipes and admit one unconfirmed attempt/application. Process-only proof, not SIGKILL/power-loss/remote exactly-once certification.
  • bun audit: exit 0, 14 packages/no advisories. No dependency install/upgrade.
  • Trusted Gitleaks 8.30.1 archive SHA-256 551f6fc83ea457d62a0d98237cbad105af8d557003051f41f3e7ca7b3f2470eb and executable/archive match verified before task-file scans. Exact pattern: env -i PATH=/usr/bin:/bin <verified-gitleaks> dir <file> --no-banner --redact=100 --ignore-gitleaks-allow --gitleaks-ignore-path /tmp/opencode/loom-t01-no-ignore. No task-file leaks detected; final report/governance rescan after review required.
  • Historical document-validator heredoc, protected-file comparison and git diff --check pass. No CLI effect command, real target/provider/login, production restore, complete policy/kill or G1 closure claimed.
  • Initial T-04 advisory requested R-001: a malformed negative cursor could be overwritten by admission when pending work existed. Parent reproduced it with a failing public regression (relay resolved instead of rejecting), then validated the cursor inside every admission transaction before any event/cursor write. Pending-work and empty malformed-cursor cases both remain covered; callback count0, pending state and unchanged cursor asserted. New fixed-artifact re-review required.
  • Corrected candidate ordered gates: lint exit0 (16 files), strict check exit0, full coverage exit0 (60 tests/555 assertions, 100% functions/95.76% lines, store99.78%, unchanged framework/index), focused exit0 (15 tests/134 assertions), audit exit0 (14 packages/no advisories). Temporary in-repo review copy initially caused Biome nested-root error; removed only that owned copy after confirming its archived manifest, then restarted the ordered gates. No lint config change.
  • Corrected T-04 re-review recommends READY FOR HUMAN REVIEW; R-001 resolved, no open confirmed findings. Baseline 39cb91549c7623601d76e43258684ab2027b7856 plus corrected overlay manifest 3f6bc846536f79e02064e155bfabadc0887d72d0ffa4915f2938a8024bee1d47. Parent verified unchanged reviewed implementation/test/fixture hashes, removed only owned repository snapshot copies, and passed final ten-task-file trusted scans and document/protected/whitespace checks. Original review retained unchanged. T-02/T-04 human approval remains pending; no commit/push or next slice authorized.

Commit authorization (2026-10-24): owner requested “commit” after the corrected T-04 handoff. Commit this reviewed implementation, fixture and both advisory reports; do not infer Ishan's approval or permission to push/continue. Pre-commit ordered checks passed again: lint (16 files), strict typecheck, 60-test coverage (555 assertions, 100% functions/95.76% lines), focused 15 tests/134 assertions and dependency audit (14 packages/no advisories). Reviewed source/test/fixture hashes unchanged; final task-file secret scans and document/protected/whitespace checks pass. T-02/T-04 human dispositions remain pending; G1 open, synthetic scope only. The temporary review archives/scanner had been cleaned before this commit task; full manifest re-verification was therefore unavailable. Source/test/fixture hashes matched the persisted corrected report. Re-fetched Gitleaks 8.30.1 into /tmp/opencode/loom-gitleaks-8.30.1-pjjroa2f, verified the same pinned archive digest/executable, then repeated all ten task-file scans successfully. No project dependency or scanner version changed; ephemeral archive loss is not hidden.

Approval record (2026-10-24): following the d0a02dd commit handoff, owner stated “Approved by Ishan”. Attribute this to the corrected T-04 implementation and re-review in d0a02ddb4a8b5577d5e7629242e67adab2a5053c; preserve initial R-001 report and its resolved history. This is owner-relayed approval, not a direct signature or independent identity verification. It does not retroactively approve T-02, close G1, enable real effects/providers or authorize push/another slice. Approval-record edits remain uncommitted pending instruction. Documentation-only validation applies; no application behavior changed. Approval-record checks: historical Python document-validator heredoc exit0 (270 links, seven active sections, unique ADRs/casing/whitespace); verified Gitleaks 8.30.1 four-file scans exit0/no leaks; git diff --check and unchanged application/tests/config/prior-report comparison exit0. Application tests/typecheck/ dependency audit N/A for this documentation-only approval record, not rerun.

T-02 approval clarification (2026-10-24): owner subsequently stated “T-02 also approved by Ishan”. Record approval of the T-02 implementation/advisory in 39cb91549c7623601d76e43258684ab2027b7856, preserving its original AI report. This supersedes T-02 pending-status references above and in historical handoffs; T-02 and T-04 are both approved as relayed by the owner, without independent signature/identity verification. No commit, push, next slice, G1 closure or live effect authority inferred. Approval-record edits remain uncommitted. Documentation validator, five-file trusted scan and whitespace/protected-code checks pass; application/typecheck/dependency gates N/A for these document-only changes.

Owner continuation (2026-10-24): owner requested “commit and continue” after both approval records. Commit the T-02/T-04 owner-relayed approval documents, then begin T-05 contract/discovery on a new feature branch; no push, G1 closure or real effect/provider use. Document validator, trusted five-file scan and whitespace/ protected-code checks pass; no application/test changes in this approval commit.

T-02 completed execution record (historical)

Historical T-02 implementation/authority below describes 39cb915; its then-pending human review is superseded by the approval record above. Current work is governed by the active T-04 contract above until the T-05 work package is specified.

  • Work package: P1 / T-02 write gate and fenced leases, started 2026-10-23.
  • Authority: owner requested “continue” after approved T-03 commit aa3287b; confirmed required gate/CLI context, retained lease rows and public test seams.
  • Branch/baseline: clean feat/p1-write-gate from aa3287b; no push/merge.
  • Status: implementation and ordered code gates verified; fixed-candidate AI review has no confirmed findings, Ishan disposition pending. G0 closed, G1 open.

1. Phase Objective & Scope

Gate native ledger writes with live global/run kill and workspace owner/epoch/ expiry checks inside the same immediate transaction. Harden acquisition/renewal/ release against invalid state, contention and epoch reuse. Owner approved changing normal transition/CLI write interfaces to require context; no compatibility bypass. Audit lifecycle remains trusted-host bookkeeping, including post-kill outcome reconciliation, not execution permission. No protected filesystem/network effect, task-completion certification, live provider, retirement or later-slice enablement. T-05 owns kill engage/reset/revocation; T-06 adds deadline/grant/policy between kill and lease checks. Do not create permissive placeholder checks for them.

2. Environment & Upstream State

Fresh baseline: bun run lint exit 0 (14 files), bun run check exit 0, bun test --coverage exit 0 (30 tests/277 assertions; functions 100%, lines 95.67%, store 99.52%, framework 87.50%, index 100%), bun audit exit 0 (14 packages/no advisories). Bun 1.4.4, SQLite 3.53.4; no install/upgrade. Installed node_modules/bun-types/sqlite.d.ts transaction/inTransaction declarations and official bun-v1.4.4/src/js/bun/sqlite.ts inspected: .immediate() starts BEGIN IMMEDIATE, nested transactions use savepoints, synchronous callback returns commit. Never put async/network work in these transactions. No Pi API change.

3. Architecture & File Manifest

File Responsibility
src/store.ts WriteContext, live gate, gated native transition, scoped read, lease validation/retained expiry
src/index.ts Normal gated exports/types; no migration-only writer export
src/cli.ts Required record context, scoped status and safe write errors; no automatic acquisition
tests/write-gate.test.ts Owner-confirmed gate/transition/lease/query/CLI seams, real process contention/recovery
tests/schema-v2.test.ts, tests/smoke.test.ts Explicit migration-fixture helper and updated lease/CLI inputs; preserve assertions
SPEC.md, ROADMAP.md, decisions.md Contract, decisions and fresh evidence
research/reviews/2026-10-23-p1-t02.md Fixed-artifact advisory for Ishan; disposition separate

Callers traced: CLI and existing schema/smoke tests call recordTransition; leases have test-only callers. T-03 tests use audit exports, unchanged. DDL/schema version, legacy rows, lock/config/runtime pins and approved review bodies stay unchanged.

Interface and invariants:

  • WriteContext={runId,threadId,workspace,owner,epoch,nowMs?} is established by a trusted host supervisor/operator, never runner self-assertion. Run/thread/owner are nonempty trimmed/control-free whitespace-free keys (max 256); workspace is an exact trusted host identity (max 4096, trimmed/control-free, internal spaces allowed). Physical path alias resolution belongs to the supervisor; no invented canonicalization or proof of isolation. Epoch is a positive safe integer.
  • Optional nowMs is a trusted fixture/host clock only; validate safe nonnegative integer in the JS Date range. Default clock sampled inside the transaction. CLI exposes no clock override. Wall-clock rollback and trusted caller misuse are not solved by TTL fencing; production clock discipline remains required.
  • writeGate(db,ctx) throws safe value-free errors; requires active transaction, validates context then checks kills for global and run:<runId> BEFORE checking lease. Presence of either row denies regardless of its descriptive fields; no scope parser substring/prefix matching. Then require valid persisted lease identity/epoch/time, exact owner/epoch and expiresAt > now. No reusable authorization token and no success outside a transaction. This is T-02's kill/lease admission only, not complete policy/effect authorization.
  • recordTransition(db,t,ctx) requires context, matching t.runId, known status, valid phase/resume/evidence, rejects unknown fields. Checks live gate and inserts thread_id=ctx.threadId in one synchronous .immediate() transaction. Returns native row with threadId. No hidden run/thread defaults or ungated overload. Phase state-machine semantics remain a later owning slice; a committed ledger fact is not independent task verification. Nested calls preserve outer rollback; a deferred outer snapshot may fail on upgrade, never bypass a failed gate.
  • Existing legacy writer renamed recordTransitionForMigration, marked for trusted fixture/migration use only, exported from store but NOT package index or CLI. It preserves unattributed NULL thread data and old return shape. Direct host DB/module access remains trusted; this marking is not a sandbox.
  • getLastTransition(db,runId,threadId?) preserves unscoped historical reads; optional validated thread restricts results without attributing legacy rows.
  • acquireWorkspaceLease requires runId as well as workspace/owner/ttlMs, checks global/run kill before acquisition or renewal in .immediate(). This is a bootstrap exception to requiring an already-held lease, not an effect gate. Lease row stays workspace-wide, not run-owned; trusted context supplies run. Positive integer TTL and nonnegative time must fit Date/safe-integer range; malformed persisted lease or exhausted epoch refuses without modifying it. Busy errors propagate for bounded caller retry, never implicit success.
  • Live same-owner renewal keeps epoch and never shortens expiry. Expired/released acquisition, even same owner, increments previous epoch. releaseWorkspaceLease accepts optional trusted nowMs, returns false for wrong/stale/expired/released lease and retains a row with expires_at=0 on valid release. Never delete epoch history. Release is safe cleanup, allowed after kill; no reacquisition on reset.
  • All bookkeeping/bootstrap exceptions are explicit: schema/migration fixtures, lease acquisition/cleanup and audit records do not authorize effects. No claim that arbitrary host SQL is gated. Kill fixture INSERTs are tests only; no partial engage/reset API, no new tables or trigger exceptions.
  • CLI record requires --run/--thread/--workspace/--owner/--epoch and existing --phase/--resume; no synthetic identity or auto-lease. It fails nonzero safely when missing/invalid/denied, writes no transition. status --thread scopes reads; init/check-framework behavior unchanged. CLI still runs only on trusted host.

4. Test Plan & Coverage Matrix

Confirmed seams: writeGate, gated recordTransition, acquire/releaseWorkspaceLease, transition queries and CLI subprocesses. SQL only for kill/malformed fixtures and unchanged-history assertions; no private mocks. Test-first vertical slices.

Scenario Required evidence
Gate/transition Active transaction required; valid context writes attributed row; missing/unknown/mismatched context adds none
Ordering/scope Global/run kill wins over missing/stale lease; unrelated run unaffected; no new ledger writes or renewal under kill
Lease fencing Renewal keeps epoch; expiry/release/reacquire increments; stale/wrong/expired finalization and release fail
Validation Invalid time/TTL/epoch/persisted rows fail without mutations; overflow refuses
Transaction/recovery Outer rollback, busy writer, abrupt process exit, reopen preserve truthful state
Contention Eight real processes compete for one workspace; exactly one effective owner/writer
CLI/compatibility Missing gate flags fail, valid lease writes, scoped status; legacy migration fixture behavior and all T-03 assertions retained

Fixtures own disposable directories under /tmp/opencode, with cleanup; no real data, credentials, sleeps as synchronization or application coverage exclusions.

5. Security, Observability & Edge Cases

Parameterized SQL, bounded runtime validation and safe errors without input/row dumps. Kill checked in the mutating transaction; release cannot erase fencing history. Gate doesn't freeze arbitrary processes or atomically cancel remote requests. No live credentials/cache/env inspection, provider calls, production DBs or workspace writes. Existing audit records remain writable for reconciliation even under kill, but grant no dispatch/approval authority. No generic async transaction callback, policy placeholder or arbitrary effect runner introduced.

6. Blast Radius & Rollback Plan

Owner-approved breaking change to normal transition and CLI recording inputs; update every caller/fixture, retaining legacy data and explicit migration seam. Lease releases now retain expired records: expected readers must treat TTL, not row presence, as ownership. Same v2 schema and audit contract; no data migration. Rollback only authorized code, never delete retained epoch rows or historical audit. Do not run old delete-release code against an active qualified system. No production authority exists; G1 stays open pending T-04–T-07 and conformance.

7. Definition of Done (DoD)

bun run lint → bun run check → bun test --coverage → bun test tests/write-gate.test.ts → bun audit → trusted verified Gitleaks scan of exact changed files, all exit 0. Compare baseline above; retain all meaningful regressions without coverage suppression. Run historical document-validator heredoc, git diff --check, and protected-file comparison for package/lock/config, runtime/framework pins, .github, .opencode, unchanged audit lifecycle tests and all approved prior review records. Review fixed candidate with ishan-reviewer, persist report and exact evidence; Ishan approval remains separate. Leave diff uncommitted unless requested; no push, live use or later slice advancement.

Execution evidence (2026-10-23, Bun 1.4.4 / SQLite 3.53.4):

  • Observed behavioral reds before fixes: release/reacquire reset epoch to 1; missing writeGate export; normal recordTransition ignored missing context; acquisition succeeded under kill; renewal shortened expiry; fractional TTL accepted; CLI ignored valid gate flags; explicit NULL clocks silently defaulted. Recovery/negative-state regressions then exercised the implemented paths.
  • bun run lint: exit 0, 15 files; bun run check: exit 0.
  • bun test --coverage: exit 0, 45 tests/421 assertions, 100% functions, 95.71% overall lines (baseline 95.67%); store 99.63% (99.52%), framework unchanged 87.50%, index unchanged 100%. No tests removed or skipped; original 30 retained, schema/smoke fixtures updated explicitly for approved interfaces.
  • bun test tests/write-gate.test.ts: exit 0, 15 tests/144 assertions. Eight real contenders produce exactly one owner and ledger writer. Busy writer cannot finalize; stale deferred snapshot cannot write after competing kill commits. Outer rollback and abrupt process exit preserve committed facts and kill rows. These supersede R-10 prototype proof for in-repo gate/fencing behavior; historical external experiments remain evidence, not deleted or treated as application code.
  • bun audit: exit 0, 14 packages/no advisories. No auto-fix or dependency upgrade.
  • Trusted Gitleaks 8.30.1 archive digest 551f6fc83ea457d62a0d98237cbad105af8d557003051f41f3e7ca7b3f2470eb and executable/archive byte match verified. Exact scan pattern: env -i PATH=/usr/bin:/bin <verified-gitleaks> dir <file> --no-banner --redact=100 --ignore-gitleaks-allow --gitleaks-ignore-path /tmp/opencode/loom-t01-no-ignore. Task-file scans clean, final governance/report rescan required after review.
  • Historical document-validator heredoc, protected-file comparison and git diff --check pass. No production clock/power-loss/restore, isolation, live provider, full kill actuation or complete policy qualification claimed.
  • Fixed-artifact T-02 advisory: READY FOR HUMAN REVIEW, no confirmed findings. Baseline aa3287bb61867d0e772595eb5bd830155279e13d plus overlay manifest SHA-256 d6660a59fe85fd09f31abbfcc03eec9c6832a4662b237e7a090975a8c34ef704. Parent confirmed unchanged reviewed source/test hashes, removed only its owned temporary repository snapshot, and completed final ten-file trusted secret scan, document/whitespace/protected-file checks. Original schema DDL and T-03 source suffix/tests remain unchanged. Report's pending closeout is historical; human disposition remains pending. No commit, push, live use or next slice authorized.

Owner continuation (2026-10-24): owner requested “commit and continue”. This authorizes committing the verified T-02 implementation/report and beginning the next planned T-04 work package, with its detailed contract before code. It does not attest Ishan's T-02 approval: that disposition remains pending. Pre-commit ordered gates repeated successfully with unchanged reviewed source/test hashes: 45 tests/421 assertions, 100% functions/95.71% lines, focused 15 tests/144 assertions, dependency audit clean; trusted task-file scans and document/protected checks pass. No push, G1 closure, live provider or production effects authorized.

T-03 completed execution record (historical)

The approved T-03 contract/evidence below describes aa3287b; the active T-02 specification above governs the authorized gated-write interface changes.

  • Work package: P1 / T-03 native audit lifecycle, started 2026-10-23.
  • Authority: owner requested “commit and continue”; confirmed lifecycle function test seams and keeping archival retirement/deletion disabled.
  • Baseline/branch: clean d8bb016 (approved T-01 plus consolidated record), feat/p1-audit-lifecycle, stacked locally; no Git merge/push performed.
  • Status: T-03 implemented and ordered gates verified; artifact-specific AI review has no confirmed findings, approved by Ishan as relayed by the owner. Owner authorized committing T-03; G0 closed, G1 open. No push/next-slice authority.

1. Phase Objective & Scope

Add openAction, recordVerdict, recordFinish, getAction, listOpenActions to the existing store/exports. Request → verdict → outcome are immutable inserts. Reject invalid/rebound/duplicate/terminal transitions atomically; recover truthful unresolved work. Preserve existing legacy helpers, CLI JSON and schema v2. No authorization/effect dispatch/task-completion certification, kill/policy, runner/provider/production integration, retirement path or subsequent slice. No automatic commit/push. Owner-approved seams are these five public functions; SQL is only for immutable-history checks and malformed-history fixtures. Native file/subprocess/transaction fixtures, no private mocks.

2. Environment & Upstream State

Fresh ordered baseline: bun run lint exit 0 (13 files), bun run check exit 0, bun test --coverage exit 0 (16 pass/115 assertions, 100% functions / 95.63% lines; store 99.40%, framework 87.50%, index 100%), bun audit exit 0 (14 packages/no advisories). Bun 1.4.4 / SQLite 3.53.4 unchanged. Installed Bun synchronous transaction().immediate and nested savepoints were checked in T-01. Verified temporary Gitleaks 8.30.1 remains under /tmp/opencode; verify its executable/archive before final scan. No dependency/runtime upgrade or raw env read.

3. Architecture & File Manifest

File Responsibility
src/store.ts Native audit types, lifecycle validation/mutations and truthful recovery queries
src/index.ts Re-export new functions/types; preserve old exports
tests/audit-lifecycle.test.ts Confirmed public seams; identity/state/evidence, malformed history, atomicity/recovery
SPEC.md, decisions.md, ROADMAP.md Contract, retention boundary, status and fresh verification
research/reviews/2026-10-23-p1-t03.md Exact-artifact report for Ishan; human approval separate

No native callers exist yet. appendAudit is an exported legacy claim writer, used only in fixtures; CLI uses transition helpers. Do not invent caller identity or migrate existing claims. T-01 DDL/signatures/guards/views/version stay unchanged.

Exact interface/state contract:

  • ActionKey={runId,threadId,actionId}. Keys max 256 chars, trimmed/nonempty, no whitespace/control characters. actionId is client-generated canonical lowercase UUID (version 1–8, RFC variant), unique within run and immutably bound to thread. Cross-thread reuse conflicts; other runs remain isolated.
  • ActionAuditEntry includes existing row fields plus required threadId, actionId, actor and tier. Decisions pending/allowed/denied/escalated/expired; outcomes pending/completed/failed/interrupted/timeout/not-executed. Actor is agent:/human:/system: plus nonempty identity (max 256), tier is standard/ high-risk/critical. Syntax records attribution, NOT physical human proof or execution authority; future trusted supervisor/operator channels own that.
  • openAction(db,key+{action,actor,tier,evidenceRef?}): one pending/pending request, action label max 256, trimmed/control-free; omitted evidence is NULL.
  • recordVerdict(db,key+{actor,decision,evidenceRef}): allowed/denied/escalated/ expired only from pending/pending or escalated/pending. Allowed/escalated stay pending; denied/expired become terminal not-executed. Escalation is unresolved, never terminal success. No duplicate allow, verdict after allow or terminal row.
  • recordFinish(db,key+{actor,outcome,evidenceRef}): completed/failed/interrupted/ timeout only from allowed/pending; preserve allowed. No duplicate finish or terminal reopening. An allowed row is not proof of dispatch; a missing finish, cancellation or timeout is not proof of no external effect.
  • Key, action label and tier stay immutable; later actors identify event authors. Evidence is required for verdict/finish: max 4096, trimmed/control-free, nonempty kind:locator, kind cmd/file/session/url/trace/approval/archive. Never dereference evidence or infer content freshness/authorization from syntax. Completed is an audit outcome observation, not verified workflow completion.
  • Mutations validate inputs and read/validate persisted native history + insert in transaction().immediate; exceptions add no rows. Nested calls use a trusted caller transaction/savepoint; outer rollback removes rows and no independent commit is claimed. No network I/O under a DB writer lock.
  • Read all native histories in the requested run (any identity metadata filled), not just latest_audit; all-four-NULL legacy claims remain excluded. Malformed, incomplete, rebound or impossible history raises a safe error, never earlier success or an empty-open result. Validate histories before thread filtering.
  • getAction(db,key) returns latest validated row or NULL for genuinely missing action, rejects wrong thread. listOpenActions(db,{runId,threadId?}) returns latest pending outcomes (pending/allowed/escalated), ordered by ID. Initial full-run history validation is a stated cost; no schema/cache shortcut now.

4. Test Plan & Coverage Matrix

Case Required proof
Happy/deny/expire/escalate Correct inserts, identity/evidence, terminal versus unresolved reads
Invalid/repeated transitions No finish without allow, repeated verdict/finish, duplicate IDs, terminal reopening; no rows added
Identity/shape/evidence Runtime validation, run isolation/thread binding, immutable label/tier; no hidden defaults
Malformed/hidden newest row No fallback to earlier success or false empty-open query; explicit failure
Recovery/atomicity File/subprocess reopen, concurrent writer and outer rollback retain truthful state
Compatibility/security Existing tests/CLI/schema/legacy rows unchanged, guards active, baseline coverage and trusted scan

Test-first vertical slices, one behavioral red then minimal implementation. Use owned disposable paths under /tmp/opencode; no real data or private mocks.

5. Security, Observability & Edge Cases

Validate identity/evidence/state despite TS types; parameterized SQL, no audit update/delete/retirement exception. Read-side malformed-history validation is not a SQL firewall: raw host access can fabricate consistent rows or alter DDL. Do not equate allowed/pending with dispatch, or audit completion with task success. No input/row/evidence dumps, accidental debug logs, credentials/auth caches/env, live model or production database access. Retention plan: export → verify manifest → separately approved critical retirement after authorization/backup/reconciliation controls; owner explicitly chose no destructive retirement implementation now.

6. Blast Radius & Rollback Plan

Opt-in new store exports only; preserve v2 schema, existing functions/CLI and approved T-01 reports. Roll back only authorized code changes; never erase audit history or downgrade schema. T-02/T-04–T-07 still gate G1. Previous approval does not certify this artifact. No automatic commit or advance beyond T-03.

7. Definition of Done (DoD)

Run bun run lint → bun run check → bun test --coverage → bun test tests/audit-lifecycle.test.ts → bun audit → verified Gitleaks snapshot scan, all exit 0. Compare fresh baseline 100% functions/95.63% overall and per-file coverage without test deletion/suppression. Run git diff --check, the document validator heredoc in historical P0 and git diff --exit-code -- package.json bun.lock biome.json tsconfig.json .github FRAMEWORK_REF src/cli.ts tests/schema-v2.test.ts tests/smoke.test.ts .opencode research/reviews/2026-10-23-p1-t01.md research/reviews/2026-10-23-p1-t01-report-review.md research/reviews/2026-10-23-p1-t01-consolidated.md. Review exact candidate with ishan-reviewer, persist report/proof/limitations; Ishan disposition separate, G1 open. No live/production qualification claims.

Execution evidence (2026-10-23, Bun 1.4.4 / SQLite 3.53.4):

  • Initial behavioral reds: missing open/query/verdict/finish exports and silently ignored unknown fields. Each was observed before its implementation. Subsequent malformed-history/recovery tests exercise existing implementation paths.
  • bun run lint: exit 0, 14 files; bun run check: exit 0. First typecheck caught two fixture typing errors (legacy optional evidence and nullable query result); fixtures corrected without casts, then ordered gates restarted.
  • bun test --coverage: exit 0, 30 tests/277 assertions. Functions 100%; lines 95.67% overall (baseline 95.63%), store 99.52% (99.40%), framework unchanged 87.50%, index unchanged 100%. Original 16 tests unchanged. An intermediate 95.52% exposed an untested orphan-history rejection and a redundant input guard; added the public regression and removed only the guard already enforced by checkFields. No exclusions/skips or weakened validation.
  • bun test tests/audit-lifecycle.test.ts: exit 0, 14 tests/162 assertions. Covers every outcome, denial/expiry/escalation, invalid/duplicate transitions, run/thread isolation, partial/rebound/orphan history, legacy exclusion, ordered unresolved queries, outer rollback, abrupt child exit and writer contention. Abrupt exit is process-recovery proof, not host/power-loss qualification.
  • bun audit: exit 0, no advisories across 14 packages; no auto-fix/upgrade.
  • Trusted Gitleaks 8.30.1: archive SHA-256 551f6fc83ea457d62a0d98237cbad105af8d557003051f41f3e7ca7b3f2470eb verified and executable byte-matched to archive. Scoped env -i PATH=/usr/bin:/bin <verified-gitleaks> dir <file> --no-banner --redact=100 --ignore-gitleaks-allow --gitleaks-ignore-path /tmp/opencode/loom-t01-no-ignore: exit 0/no leaks for source/exports/new tests and all three changed governance files. Source-only scan does not certify Git history, credentials or production state.
  • No runtime/provider E2E: no such integration in this slice; store subprocess recovery/concurrency regressions are the applicable E2E seam. No production host/power-loss or timed restore claim, no provider login/use or audit deletion.
  • Artifact-specific T-03 report: AI recommendation READY FOR HUMAN REVIEW, no confirmed findings. Exact baseline d8bb016df9f2083ae6646bea68bfe91c345f12e5 plus fixed overlay manifest SHA-256 9f7481b42cc110fa583e3a24fc92cb589cebc87c6eeadd5206f1f9cd1186ff7f. Initial external snapshot read denied; identical in-repo temporary copy made readable and reviewed, then removed. No source/test changes after that snapshot; parent verified hashes, final documents and all seven task-file secret scans. Document validator/protected-file comparison/git diff --check exit 0. Linear full-run validation, trusted host SQL and process-only recovery limits retained. No human approval, commit, push or phase advancement inferred.

Approval/commit closeout (2026-10-23): owner stated “approved by Ishan, commit”, following the T-03 report handoff. Record approval of that reviewed implementation/report as owner-relayed, not an independently verified signature. Source/test hashes remain those in the review. Fresh pre-commit rerun of lint → strict typecheck → full coverage → focused regression → dependency audit and verified seven-file Gitleaks scan passed (exit 0); full suite 30 tests/277 assertions, 100% functions/95.67% lines, focused 14 tests/162 assertions, no dependency advisories or detected secrets. Document/whitespace/protected-file checks passed. Commit only this T-03 slice and approval record; no push, G1 closure, live use, retirement or subsequent slice authorized.

T-01 completed execution record (historical)

Historical T-01 contract/evidence below applies to its approved artifact; current work is governed by the active T-03 specification above.

  • Work package: P1 / T-01 schema and safe migrations, started 2026-10-23.
  • Authority: owner stated “merged. start P1”; PR #4 merge verified at 2be0e4fe7a593887ce690062e68a8dfaeaf170a7. G0 closed; T-01 scope approved.
  • Branch: feat/p1-schema-migrations, clean start from that merge.
  • Status: T-01 implementation and ordered gates verified; implementation review and report meta-review approved by Ishan as relayed by the owner. Consolidated disposition below preserves both original review snapshots. Owner confirmed store/SQL/CLI test seams, legacy NULL identities and a temporary verified Gitleaks download. No other P1 slice, live provider or release enabled.

1. Phase Objective & Scope

Review closeout (2026-10-23): owner stated “Approved by Ishan and merge the meta-review and the previous agent review”. Consolidate those two reports into one current review/disposition record; preserve originals, hashes and their historical pending fields. Approval is attributed through the owner, not a direct signature or independent identity check. This is report consolidation only, not Git branch/PR merge, new implementation, push, deployment or another P1 slice. The consolidated rendering is a parent-authored synthesis of approved sources, not a third independently reviewed artifact or new human approval.

Implement schema v2 in the existing store: atomic fresh/recognized-scaffold migration, explicit durability, immutable audit, scoped latest views and empty kill/budget/usage/grant structures. Preserve existing public helper signatures, return objects and CLI JSON; old helpers remain unattributed claim writers, not effect/approval authority. T-03 will own native lifecycle validation. No Pi/runtime dependency, runner, provider call, policy, outbox relay, kill/reset implementation, production migration, automatic backup job or new CLI command. No commit/push/merge without separate request.

Owner-approved seams: public openDb/initSchema and reopen behavior; SQL schema/views/immutability on their returned Database; CLI subprocess regressions. No private-helper mocks. Legacy rows keep their exact existing values and NULL new identities; no inferred actor, main thread, action ID, grant or approval.

2. Environment & Upstream State

Linux x86_64 7.2.8-9-omarchy, Bun 1.4.4 (already installed; no upgrade), SQLite 3.53.4, Node 26.7.0, installed TypeScript/Biome and unchanged lock. Installed Bun declarations confirm synchronous transaction().immediate, inTransaction, serialize and readonly connections. Official SQLite driver docs checked at https://bun.com/docs/runtime/sqlite (old bun.sh URL returned 404). Docs are evidence; ADR-008 requires FULL, not the docs' optional NORMAL tuning.

Fresh ordered baseline: bun run lint exit 0 (12 files), bun run check exit 0, bun test --coverage exit 0 (3 pass, 100% functions / 89.73% lines; store 91.95%, framework 87.50%), bun audit exit 0 (14 packages, no advisories). Historical Bun 1.4.3 coverage was 90.99% lines; source is unchanged and baseline runtime differs, so use today's fresh baseline rather than claim equivalence. Gitleaks/TruffleHog absent on PATH. Owner authorized Gitleaks 8.30.1 under /tmp/opencode, verified against published checksums/release digest; no global installation, telemetry, credential/cache access or Loom dependency.

3. Architecture & File Manifest

File Responsibility
src/store.ts Sole schema owner; recognition, PRAGMAs, atomic migration, SQL definitions and compatibility helper preservation
tests/schema-v2.test.ts Fresh/legacy/refusal/rollback/immutability/views/durability/clone-restore/public-helper/CLI tests
tests/smoke.test.ts Keep three existing cases; move disposable file fixture under /tmp/opencode if touched
SPEC.md, decisions.md, ROADMAP.md Exact contract, significant legacy/durability decision, phase status/evidence
research/reviews/2026-10-23-p1-t01.md AI-assisted exact-artifact report for Ishan; human disposition separate
research/reviews/2026-10-23-p1-t01-report-review.md Immutable source meta-review; historical issuance/provenance retained
research/reviews/2026-10-23-p1-t01-consolidated.md Current combined implementation/report assessment and owner-relayed Ishan approval

src/cli.ts opens/initializes in init/record/status; src/index.ts re-exports store functions/types. Test these callers without changing their shapes. Preserve package/config/lock/framework pin and approved P0 reports. CLI read-only status hardening is later T-07; do not claim it is implemented by T-01.

Exact schema/migration contract:

  • Recognize only empty unversioned DB; exact known scaffold (implicit v1, user_version=0, no migration table); or intact v2 with user_version=2 and one nonempty schema_migrations(version=2, applied_at) row. Other metadata, extra/missing/changed application schema objects or versions fail closed. Compare SQLite's stored schema declarations to references built from shipped DDL (including views/triggers/indexes), not table names alone. Ignore SQLite internal objects; no arbitrary SQL from the database is executed as migration.
  • Reject unsupported DBs before changing persistent journal mode. Reject nested initialization transactions rather than silently using savepoints. Close the owned connection if open/configuration fails; caller retains directly supplied connections on initialization failure.
  • File-backed connections require WAL, synchronous=FULL (2), foreign_keys=1, recursive_triggers=1 with read-back. In-memory fixtures explicitly use MEMORY journal, not file-backed durability proof. Configure outside transactions; recheck schema under BEGIN IMMEDIATE, migrate/mark version in one transaction.
  • Keep original transitions/leases/audit columns and rows, including IDs, timestamps/evidence/status strings and AUTOINCREMENT high-water marks. Add nullable thread_id TEXT to transitions/audit, and nullable action_id TEXT, actor TEXT, tier TEXT to audit. No legacy rewriting.
  • Add schema_migrations(version INTEGER PRIMARY KEY, applied_at TEXT NOT NULL); only version 2 is recorded at actual migration time; do not invent v1 history.
  • Add kills(scope TEXT PRIMARY KEY, engaged_at TEXT NOT NULL, actor TEXT NOT NULL, reason TEXT NOT NULL); budgets(run_id TEXT, kind TEXT, used INTEGER, "limit" INTEGER NULL, updated_at TEXT) keyed by run/kind with nonnegative integer used/limit; kinds time-ms/retries/cost-tokens/cost-minor-units/threads/ tool-calls. NULL limit represents unset, not a seeded allowance. Stored counter/expiry integers are bounded to JavaScript's safe range (0..9007199254740991); no floating-point counter or silent integer rounding.
  • Add usage(id INTEGER PRIMARY KEY AUTOINCREMENT, run_id TEXT, thread_id TEXT, kind TEXT, amount INTEGER, evidence_ref TEXT NULL, created_at TEXT) with required nonempty IDs/kind and nonnegative integer amount; immutable inserts, no provider ingestion/accounting enabled. Add grants(grant_id TEXT PRIMARY KEY, run_id TEXT, thread_id TEXT, tool TEXT, pattern TEXT, expires_at INTEGER) with nonempty text fields and nonnegative integer expiry. All new authority/counter tables empty.
  • latest_transition: latest id per run/thread for known, nonempty thread IDs. latest_audit: latest id per run/thread/action with complete nonempty identities and tier standard/high-risk/critical. Legacy NULL rows are excluded; their original query APIs still read them as claims. Views are observations, not authorization. No seeded policies, synthetic identities or effective grants.
  • Audit and usage UPDATE/DELETE fail by BEFORE triggers. Recursive triggers plus BEFORE INSERT collision guards prevent REPLACE/UPSERT from rewriting existing immutable rows. Schema validation rejects removed/altered guards.
  • Rollback uses verified consistent backups into a separate path, never schema downgrade/reset or deletion of live WAL. Fixtures use SQLite VACUUM INTO outside transactions; test clone integrity/version/data, not production RTO.

4. Test Plan & Coverage Matrix

Seam/case Required observation
Fresh and repeat init Exact tables/columns/constraints/indexes/views/guards; one migration record; no duplicate facts
Recognized legacy Every original field preserved; NULL new identities, same sequences, no new authority rows or view promotion
Unknown/newer/partial/drifted Refusal with original schema/rows/version/journal unchanged; no reset or repair-by-guessing
Mid-migration disk exhaustion SQLite max_page_count fault; original DDL/data/version intact after failure/reopen, then retry succeeds
Immutable records UPDATE, DELETE, OR REPLACE, UPSERT/ID collision cannot alter audit/usage; normal INSERT still works
Scoped views Latest-per-key; separate run/thread/action; legacy claims excluded
File durability/read-only/nesting Mandatory PRAGMA read-back, rejected unsafe init context, connection/resource cleanup
Backup/restore/reopen Consistent clone and integrity_check; source unchanged; version mismatch rejected
Public compatibility/CLI Existing helpers/JSON preserved; init/record/status subprocesses work, unknown schema exits nonzero
Coverage/security Fresh baseline comparison; no coverage removal/suppression; read-only audit and trusted secret scan

Vertical test-first slices: one failing behavior, minimal implementation, repeat. No infrastructure-only test failure relabeled as a behavioral red. All fixture files synthetic under /tmp/opencode and cleaned with exact owned paths.

5. Security, Observability & Edge Cases

Unknown DB content is not migration authority. Parameterize values; fixed shipped DDL only. Owner accepted nullable legacy identity exception to R-11/R-13 proposals; no unknown claim enters authoritative scoped views. Preserve original schemas and data on refused migration. Trusted host/operator/DB access remains a boundary assumption; raw Database handles can drop triggers, so this is not a hostile- same-process sandbox. Validate guards on initialization, not a claimed SQL firewall. No live model, credentials, raw .env, network provider or production DB access. Errors must be explicit without dumping record contents. No accidental debug logs. Scanner absence/failure blocks T-01 sign-off; do not substitute regex review.

6. Blast Radius & Rollback Plan

Affected layer is the local store and schema, plus its existing CLI/library consumers. Test only disposable DBs; no user database is opened/migrated. Existing claims remain readable; native identity APIs/lifecycle/authorization wait for their later slices. SQL schema is a deliberate v2 change; unknown layouts refuse. For real upgrades require operator-approved consistent backup and restore review; code rollback is not a downgrade. Revert only authorized task changes, preserving user work, P0 history and verified backup artifacts. No production support claim.

7. Definition of Done (DoD)

Run in order: bun run lint → bun run check → bun test --coverage → bun test tests/schema-v2.test.ts → bun audit → verified Gitleaks local scan. Compare coverage with today's 100% functions/89.73% lines and per-file baseline; record any denominator/runtime differences. Run git diff --check and the document/structure validator retained below (active-section selection stops at the next level-two heading). Verify unchanged config/lock/pin with git diff --exit-code -- package.json bun.lock biome.json tsconfig.json .github FRAMEWORK_REF. Review the exact diff/candidate with ishan-reviewer, persist report and pending Ishan disposition. Record commands/results, red/green proof and limitations here; G1 stays open. No automatic commit/push or advancement to another slice.

Implementation proof so far (2026-10-23): registry, nullable legacy metadata, strict schema refusal, append-only and durability behaviors each had intended failing tests before implementation. Disk-full fault and competing writer tests show atomic rollback/refusal and clean retry without private mocks. A discovered LIKE 'sqlite_%' wildcard mistake was reproduced by an extra sqlitexrogue table and fixed with literal-prefix GLOB 'sqlite_*'; its regression passed. CLI and backup/clone checks are synthetic only. Current verified temporary scanner binary: /tmp/opencode/loom-gitleaks-8.30.1.pje2WE/gitleaks; archive SHA-256 551f6fc83ea457d62a0d98237cbad105af8d557003051f41f3e7ca7b3f2470eb, matching published checksum and GitHub release digest; checksum-list digest also matched. Initial 84-file tracked-source-plus-new-test snapshot scan found no leaks; final candidate checks and review results must be recorded below or in its report.

Fresh gate (2026-10-23) Result Limitation
bun run lint Exit 0; 13 files Configured Biome rules only; initial formatting errors corrected in task files
bun run check Exit 0 Existing strict TS configuration unchanged
bun test --coverage Exit 0; 16 pass/115 assertions; 100% functions, 95.63% lines Fresh baseline 100%/89.73%; store improves 91.95%→99.40%, framework unchanged 87.50%; index now measured at 100%. Durability read-back mismatch guard not fault-injected on a platform honoring those PRAGMAs
bun test tests/schema-v2.test.ts Exit 0; 13 pass/103 assertions Public store/SQL, file-backed/native faults, backup/CLI fixtures; no production migration or runner conformance
bun audit Exit 0; no vulnerabilities among 14 packages No full license/provenance assessment; no auto-fix or dependency changes
Trusted secret scan and final artifact review Initial verified Gitleaks scan passed; final candidate snapshot/result/identity recorded in T-01 report Current source snapshot only, not credential stores or full Git history; Ishan disposition separate; G1 remains open
Review consolidation/approval record (2026-10-23) Owner relayed Ishan approval of both reports; document validator passed (258 links/seven sections/unique IDs); source-report SHA-256, four-file whitespace/provenance/authority assertions and git diff --check passed; application/config/pins/original reports unchanged Approval metadata and parent synthesis only; no additional application tests required. Original pending fields are historical; current disposition is in the consolidated record. No Git merge, later slice or live use implied

P0 completed execution record (historical)

Historical scope/commands/results below describe P0 and are not P1 authorization. Current work is governed by the active P1 specification above.

  • Work package: P0 G0 acceptance record, 2026-10-23; prior preparation/evidence dated 2026-10-22.
  • Authority: user authorized starting P0 after PR #1 merged; confirmed existing TS repository, Linux/local evaluation and offline-only experiments.
  • Branch: chore/p0-subscription-provider-review, from G0 pack 558610f.
  • Status (2026-10-23): G0 ACCEPTED / CLOSED. Owner stated “G0 accepted” after reviewing the package and scope/failure assumptions. T-01 scope is approved; P1 implementation has not started. Detailed P1 specification and baseline precede code. No live/provider/production authority is added.
  • Evidence history: User specified Codex subscription access and asked to consider Google Antigravity subscription. These are provider candidates, not permission to log in, consume quotas, add a fallback, replace Pi SDK or claim eligibility. Review complete: SIWC direct is a conditional candidate; consumer Antigravity third-party access is prohibited by current terms. ADR-010 now records an accepted disabled qualification direction, not live-provider adoption. Owner clarified personal OpenAI account, GPT-6.1 Sol initial model candidate, private-source permission and a required training/improvement opt-out with no additional retention/residency requirements for now; owner also confirmed gpt-6.1-sol is available on that personal account (attestation, not an API check). Owner has confirmed the training opt-out and now explicitly attests Codex Include environments is off; these are attestations, not independent account checks. Applying account controls remains an owner action; an offline check of installed codex-cli 0.163.0 found no account data-control setting, and its local include_environment_context=true default is not proof of the account-level Include environments state. Public source review of official Codex and three third-party Codex-auth/account tools likewise found no supported account-control query; they implement OAuth, rotation or usage, not training/Include environments verification. The owner later restated “codex api”; this is recorded as the already-requested subscription/SIWC candidate, not the legacy private backend and not a silent switch to Platform API-key billing. Provider/model independence is now recorded as an architecture invariant; this profile is only the first integration candidate. Owner authorized the user-level rootless lab setup; Docker 29.9.2 is running rootless with tested CPU, memory, PID and whole-container cleanup controls. A fixed 2 GiB ext4 workspace (read-only rootfs, 64 MiB tmpfs /tmp and /dev/shm) was provisioned and ENOSPC-tested; mount preflight, log caps and boot persistence remain. Final image pin, broker, port publishing and production-host qualification remain open. Subscription preference is “Plus tier + Free tier subject to availibility”; eligibility and integration/data-policy proof stay gated before live use, not synthetic P1. Owner approved deferring live qualification with the integration disabled. Independent reviewer Ishan Singh's approval of the fc0e05e report is relayed by the owner on 2026-10-22; the follow-up report approval is recorded separately. Owner accepted the G0 package on 2026-10-23 and previously approved the T-01 schema/safe-migration scope. No login, live model calls or executable application changes. Prior docs commits include 67a94fc, 98a6975, 7caac84 and 22fbd43; this workspace-cap delta is covered by the owner's commit request.
  • Next gate: prepare the detailed seven-section P1/T-01 specification and exact migration contract before code; P1 start remains a separate action. G1 implementation proof is not satisfied by G0 acceptance. No paid/live calls, deployment or dependency promotion authorized here.

1. Phase Objective & Scope

Gate acceptance record (2026-10-23): record the owner's exact “G0 accepted” decision against the closure package, approved T-01 scope and stated failure assumptions. Synchronize current gate status in SPEC/ROADMAP/decisions and the support/decision/closure records; preserve the reviewed reports and their artifact identities. This is approval metadata only, not P1 implementation, new qualification, install, commit/push or live-use permission. Earlier pending G0 language below describes preparation before this explicit acceptance.

Closure-preparation scope (owner-requested, 2026-10-22): resolve R-001 using the accepted one-hour recovery target; synchronize account attestations; record the owner's disabled-provider/synthetic-only boundary; prepare the first T-01 slice, gate-by-gate evidence ownership and closure checklist in research/phase-0/09-g0-closure-readiness.md; obtain an AI follow-up review for Ishan. No application/test changes, installs, host changes or P1 execution. The user approved deferring live qualification and identified Plus plus Free subject to availability as qualification candidates. Free is not fallback or account rotation. G0 acceptance and approval of the specific first slice remain explicit human decisions; do not infer them from this preparation request. Subsequent owner decision: “T-01 approved” approves the schema/safe-migration slice described in the closure packet. Record scope approval only; G0 package acceptance and P1 start are not inferred. Exact migration/API/legacy contracts and the seven-section P1 specification still precede application/test edits. This approval-record delta does not modify the approved reports or expand their artifact scope; prior commit/push authorization ended with PR #2's preparation. The prior commit request ended at dbbc576; this delta is not authorized for commit/push. Preserve the original approved report, append a new follow-up report.

Reviewer work package (owner-requested, 2026-10-22): install a project-local OpenCode reviewer profile and produce an AI-assisted G0 report for Ishan Singh against fc0e05e. Persist the profile and reports, not a daemon or autonomous schedule. The reviewer recommends; Ishan alone records his human disposition. Owner has since relayed Ishan's approval of the report for fc0e05e; record the relay and its exact scope without inventing a direct signature, finding waiver or phase approval. Preserve the original report body and append disposition. This tooling does not replace independent human review or authorize G0 closure, P1, Loom provider calls, pushes or production effects. Owner has now explicitly authorized committing this reviewer setup and report-approval record; no push or phase advancement is authorized.

Investigate official subscription eligibility, third-party/custom-harness use, auth/billing/data terms and installed Pi 1.4.0 provider seams. Distinguish a native provider adapter from vendor permission and working integration. Record Codex subscription as the requested route and Antigravity as an additional candidate, not an automatic fallback or a second execution runtime. Identify a supported host-side credential/egress path or a blocker; preserve the accepted whole-runner isolation and one-runtime decisions. Record the owner's initial qualification profile, not a core model dependency: Loom's authority, workflow and verification remain provider/model-independent; each enabled integration needs qualification and explicit selection, no silent fallback. Private-source permission does not waive secret hygiene or authorize unrelated personal/customer data, OAuth/login or live allowance consumption. The owner's explicit commit request covers the preceding docs delta only. The owner separately authorized the user-level rootless lab setup recorded below. Out of scope: application/test/probe edits, dependency/scanner installation, live model calls, credentials, host configuration beyond that authorized lab setup, production qualification, framework re-pin, P1, further commits, publication or deployment. No auth/cache/keyring inspection, OAuth login/refresh, private endpoints, quota-consuming requests, client impersonation, limit circumvention or plugin installation.

2. Environment & Upstream State

Closure baseline: clean dbbc576. Read-only caller trace: openDb/initSchema in src/store.ts are called by src/cli.ts and tests/smoke.test.ts and exported through src/index.ts. No dependency/schema/config change is needed for G0. R-001 was reproduced with an assertion on ROADMAP's Recovery table row (exit 1, 30-minute roadmap versus accepted one-hour ADR-008). Re-run that assertion after correction. Earlier runtime/lab experiments remain historical evidence, not reruns.

Reviewer tooling: installed OpenCode 2.1.1; V2 agents and permissions docs checked on 2026-10-22. Project profiles live in .opencode/agents/; subagents inherit the invoking model when no model is pinned. No provider integration, dependency or global configuration is installed. Verify profile discovery with opencode debug agents; report any activation/runtime limitation explicitly. References: https://opencode.ai/v2/docs/agents and https://opencode.ai/v2/docs/permissions (mutable docs; installed discovery and actual dispatch were checked separately).

Observed 2026-10-22: Linux x86_64 (Omarchy), 16 logical CPUs, approximately 15 GiB RAM; Docker and bubblewrap on PATH, Podman absent. This is the development host, not a qualified deployment or sandbox. Bun 1.4.3, Node 26.7.0; existing TypeScript 5.9.3, Biome 2.5.14, existing bun.lock. These are observations, not newly promoted support pins. .env.example is absent; no raw environment values read. Read-only inspection for this package observed embedded SQLite 3.53.4 with in-memory synchronous default 2, and Docker endpoint server 29.9.1 reporting cgroup v2/systemd but no rootless security option. No file-backed authority DB, daemon config or running container was modified; these are facts, not qualification. The scaffold's schema is owned by src/store.ts; no schema change in this task. Framework selection stays in FRAMEWORK_REF; ADR-005 selects coding-agent SDK 1.4.0, with no runtime dependency added to Loom. No separate upstream SOP URL/ref is configured; this change adapts the user-supplied playbook into reviewed repository governance. Merged master was fetched read-only over HTTPS after verifying PR #1's merge. Prior 1.3.0/1.4.0 comparison evidence is committed at 5ae0737; no new runtime experiment or installation is required for this docs-only package. The G0 decision pack is committed at 558610f; approved design choices remain unchanged. Inspect only published static code/declarations in the existing external Pi 1.4.0 tree, never credential stores or local account configuration. The sibling framework is at bd0cacc5 with unrelated untracked work: preserve it and read the pinned commit through Git, never substitute its working tree. No raw host skill/config directories are mounted. Bubblewrap 0.13.1 runs an empty unshared domain on this host. At the initial observation, Docker reported seccomp and cgroup namespaces but not rootless mode; the separate lab setup is below.

Rootless lab setup (owner-authorized, 2026-10-22): official static Docker 29.9.2 and rootless extras under $HOME/bin, with rootlesskit 3.3.0 and slirp4netns 1.3.6; user docker.service active; separate rootless CLI context, with the prior default context restored. The daemon reports name=rootless, storage driver overlayfs, cgroup driver systemd. Controlled runs enforced 1 CPU (100000 100000, throttled 20/21 periods), 512 MiB memory (32 MiB over-limit OOM, exit 137) and 64 PIDs (fork denied at 16); a container whose PID 1 and child ignored SIGTERM exited 137 under docker stop -t 1 with no surviving process or heartbeat write. A --storage-opt size=64m probe wrote 128 MiB, so Docker's storage option is not an enforced disk cap here. The selected cap is a fixed 2 GiB ext4 workspace image under $HOME/.local/share/loom-lab, mounted by udisks at /run/media/$USER/loom-workspace; with a read-only rootfs and 64 MiB tmpfs /tmp and /dev/shm, a 2.3 GiB fill stopped at 1.9 GiB with ENOSPC (dd exit 1) and a 100 MiB /tmp fill stopped at 64 MiB. The image store remains supervisor-owned and uncapped, so mount preflight and log caps are required. The rootful daemon was not modified. Final image pin, linger/boot start, port publishing, broker integration and production host remain unqualified; --skip-iptables was used because nf_tables was not loaded. The logged netns warning matches documented detach-netns noise on working setups, not a proven failure. Exact hashes and evidence are in the G0 pack.

Neither gitleaks nor trufflehog was found on PATH; record scanner coverage honestly. Biome currently uses rules.preset: "none"; its configured checks passing is not proof of a comprehensive static/security rule set. Tightening it is a separate scoped implementation decision, not an unrequested edit here.

3. Architecture & File Manifest

File Operation / responsibility
SPEC.md Declare subscription review scope, sources and verification.
decisions.md Record significant provider/boundary recommendation without inventing final eligibility or approval.
research/phase-0/08-subscription-provider-review.md Official eligibility/auth/data evidence plus static pinned Pi integration seams and blockers.
research/phase-0/06-g0-decision-pack.md Synchronize provider candidates and remaining approval/qualification inputs.
research/phase-0/05-p0-support-profile.md Record the user's requested subscription route and candidate, retaining live-call prohibition.
ROADMAP.md Synchronize P0 execution status with the recorded provider profile; no phase advancement.
.opencode/agents/ishan-reviewer.md Persistent read-only review profile, evidence workflow and report contract.
AGENTS.md Review dispatch and human-approval pointer.
research/reviews/2026-10-22-g0-fc0e05e.md AI-assisted baseline review, findings and owner-relayed Ishan report approval.
research/phase-0/09-g0-closure-readiness.md Closure checklist, disabled-provider boundary, first-slice proposal and future-gate obligations.
research/reviews/2026-10-22-g0-follow-up.md Follow-up AI report against an exact content-hashed document candidate; Ishan approval separate.

No Loom public API, dependency, schema, exported type, production runtime permission or CI behavior changes. Project OpenCode reviewer configuration is the only tooling configuration change. No lowercase spec duplicate or additional ADR directory.

4. Test Plan & Coverage Matrix

Layer This task's proof Applicability / limit
Application/unit/integration/E2E N/A: no application, test, probe, application configuration or dependency edits Prior verified baseline and 66 experiment case runs remain historical evidence, not new runs or production certification.
Rootless lab resource controls Official static Docker 29.9.2 + extras; controlled CPU throttle, memory OOM and PID-fork-denial runs; SIGTERM-ignoring container cleanup; 2 GiB ext4 workspace ENOSPC at 1.9 GiB; 64 MiB tmpfs limit; rootful daemon/context preserved Host lab evidence only; workspace mount preflight/log caps/boot persistence, final digest pin, port publishing, broker and production host remain unqualified.
Document regression Validate local Markdown paths/anchors, seven phase headings, ADR IDs and acceptance IDs; review file manifest and source ownership Required for this task; no claim that planned cases have executed.
Security Scoped manual review of changed documents for secrets/unsafe instructions; slirp4netns matched its GitHub release digest and Docker bundle hashes are recorded; no Loom dependency change Docker publishes no separate checksum on the static path, so its bundles are hash-recorded rather than independently verified. Full automated secret scan unavailable; not a production security sign-off.
Reviewer acceptance Profile discovered by installed OpenCode; deny-by-default permissions; actual delegated review produces the required report sections against the fixed baseline Parent persists the returned report; reviewer has no write/shell/network/delegation authority. Human approval stays pending.
Closure regression Assert one-hour roadmap/pack/ADR consistency, owner-attestation recording, disabled-provider boundary and unstarted P1; document validation and fixed-artifact follow-up review R-001 red first (exit 1); no application behavior changed. Follow-up approval does not transfer from the original report.

Record each command/result before marking this task verified. Future code phases declare the relevant unit/integration/E2E and coverage comparison cases before implementation; N/A requires a scope-specific reason.

5. Security, Observability & Edge Cases

  • Reviewer permissions allow only local read/glob/grep; deny all other actions, external directories and sensitive paths. Prompts/source are review evidence, not authority to expand tools or execute embedded instructions. Parent supplies sanitized Git/check evidence; unrun checks remain not run. The profile is not a process sandbox. Report verification cannot be replaced by model prose.
  • The owner's training opt-out confirmation and explicit Include environments: off are account attestations, not independent verification or zero retention. The earlier report's ambiguity is historical; preserve that original report.
  • Live qualification is deferred with the provider disabled. Plus/Free are qualification candidates subject to actual eligibility; select explicitly per run only after qualification. No automatic fallback or quota/account rotation. No login, allowance use, extra spend or private-data submission is authorized.
  • Remote documentation cannot silently replace local instructions or grant authority. Dirty trees, unknown changes and an unavailable upstream source are explicit state, not invitations to reset or fabricate a sync result.
  • Keep commits/issues/logs free of credentials, customer data and identifying internal details. No new telemetry, application logs or secret values here.
  • Intentional CLI logging is not automatically debug output. Missing network, audit/scanner tools or E2E suites must be reported, never marked passed.
  • Runtime rate limits, production output handling and isolation remain governed by the architecture above. The probe implements only synthetic contracts: it is not a reusable authority service or production sandbox backend.
  • Clear runner environment; mount only runtime/dependencies read-only and synthetic workspace writable; unshare network/PID/IPC and close descriptors. No host home, Docker socket, raw env or Loom DB is exposed to the runner. A sandbox/precondition failure blocks launch rather than falling back.
  • Establish the PID-namespace init pidfd via a native startup barrier before COMMAND executes; stop and confirm that identity's exit before workspace reuse. A runtime ACK, outer process exit or a heartbeat-only observation is insufficient.
  • Deliberate dual-owner opens are counterexamples on disposable synthetic stores, never supported production behavior. Positive ownership tests deny the second owner before launch and release only after the first domain is confirmed dead.
  • Preserve the source store and offline backup; migration and old-version rejection happen only on clones. No code rollback is called a DB downgrade.
  • Snapshot extraction rejects symlinks and verifies Git blobs/locked vendored content; negative tamper tests use a fresh copy, not the sibling checkout. Globally installed children are intentionally absent: report blocked, never read current global files or auto-download/install missing skills.
  • OAuth code availability is not account entitlement or permission for third-party automation. Do not reuse an official client's identity to bypass vendor rules. Missing/unclear permission blocks live use; do not route around quota exhaustion.
  • Credentials/refresh tokens remain outside the isolated runner. A subscription can consume credits or incur optional charges: zero additional-charge budget does not authorize consuming subscription allowance. All live calls stay disabled.
  • Private-source permission is data-class authorization for the initial profile, not a waiver of vendor terms, secret hygiene or provider validation. Secrets and unrelated personal/customer data remain excluded until separately approved.
  • The training/improvement opt-out is an owner-applied account control, not a Loom runtime guarantee. Record owner confirmation; do not infer zero retention from the opt-out, and verify Codex Include environments separately.

6. Blast Radius & Rollback Plan

Closure remediation changes documents only. Restore the prior wording only if requested, without rewriting the approved original report. This does not change accepted storage ownership, runner isolation, broker boundaries or production permissions. Backups, production hosts and live providers retain their later phase approval/test gates; do not provision them merely to close planning.

Reviewer additions affect project OpenCode configuration and review documents only, not Loom execution or global agents. If removal is requested, remove this specific profile/pointer and reload project configuration; retain review history. Changing the reviewed artifact invalidates its recommendation for the new artifact.

Changes affect P0 planning/research documents plus an owner-authorized user-level rootless Docker lab install under $HOME/bin with a systemd user unit, a separate CLI context, and a 2 GiB workspace image at $HOME/.local/share/loom-lab/workspace-2g.img mounted via udisks. The rootful daemon, its default context endpoint and Loom data were not modified. If removal is authorized, run the rootless setuptool uninstall, stop/disable the user unit, and remove only the user-level binaries/context and workspace image/loop mount; loop deletion may require operator authorization. Never touch the rootful daemon or unrelated user data. Review for accidental authority expansion, case-collision paths and references to unsupported tooling. Before merge, revise only this task's identified files; after commit, revert its specific commit only with authorization, preserving unrelated work and decision history. No feature flags/down-migrations are needed for this experiment. Preserve evidence; no broad temporary-directory deletion.

7. Definition of Done (DoD)

Run in this order; each required executable check must exit 0:

  1. Run the read-only document/structure command below — local links/anchors, seven active sections, acceptance/ADR IDs, casing and whitespace.
  2. git diff --check — tracked document whitespace; validate new files too.
  3. git diff --exit-code -- src tests research/pi/probes package.json bun.lock biome.json tsconfig.json .github FRAMEWORK_REF — prove code, experiments, config, dependencies and pin unchanged.
  4. Manual status/evidence/secret review: all proposed versus accepted decisions are labeled; host setup is recorded as lab evidence, not production support; no fabricated reviewer sign-off, host support or G0 closure.
  5. Reviewer package: opencode debug agents must list ishan-reviewer; inspect its parsed permission rules against the profile. Dispatch one fixed-baseline review, inspect cited evidence and persist its report with human disposition pending. Re-run the document validator and git diff --check for final files. Missing custom-agent activation blocks a claim of deployed runtime validation; a fallback review must be labeled with the actual agent used.
  6. Closure delta: run python3 assertions that ROADMAP's Recovery row contains one hour, the decision pack and ADR-008 retain the same target, and closure documents preserve disabled live calls, zero paid budget and pending P1. Record a manifest/content hash for the corrected candidate before dispatching ishan-reviewer; a new report is not approval of a different artifact. No application gates are required for these document-only edits. The proposed P1 gate commands and baseline/tool limitations belong in the closure packet.

Application lint/typecheck/test/coverage/audits are N/A for this docs-and-lab delta; their preceding results remain at 5ae0737. The host change is the authorized user-level rootless lab, not a Loom application/runtime change. Required engineering tools and production integration/security gates remain open for their affected phases.

Read-only document/structure check (no application/test file generated):

python3 - <<'PY'
import pathlib, re, unicodedata, urllib.parse
root = pathlib.Path.cwd()
changed = [pathlib.Path(p) for p in
           ('AGENTS.md', 'SPEC.md', 'decisions.md', 'ROADMAP.md', 'CONTEXT.md')]
profile = pathlib.Path('research/phase-0/05-p0-support-profile.md').read_text()
assert all(line == line.rstrip() for line in profile.splitlines()), 'profile whitespace'
cases = re.findall(r'^\| (P0-A\d{2}) \|', profile, re.M)
assert len(cases) == 12 and len(set(cases)) == 12, 'missing/duplicate acceptance IDs'
for file in changed:
    assert file.is_file(), file
    assert all(line == line.rstrip() for line in file.read_text().splitlines()), file
names = [p.name.casefold() for p in root.iterdir() if p.is_file()]
assert len(names) == len(set(names)), 'case-only duplicate root file'
active = pathlib.Path('SPEC.md').read_text().split('## Active phase specification\n', 1)[1].split('\n## ', 1)[0]
assert re.findall(r'^### (\d)\. ', active, re.M) == list('1234567')
records = pathlib.Path('decisions.md').read_text()
ids = re.findall(r'^## \[(ADR-\d+)\]', records, re.M)
assert ids and len(ids) == len(set(ids)), 'duplicate/missing ADR IDs'
count = 0
for file in changed + list(pathlib.Path('research').rglob('*.md')):
    text = file.read_text()
    links = re.findall(r'\]\(([^)\s]+)\)', text)
    links += re.findall(r'^\[[^\]\n]+\]:\s*(\S+)', text, re.M)
    for link in links:
        parsed = urllib.parse.urlsplit(link)
        if parsed.scheme:
            continue
        target = ((file.parent / urllib.parse.unquote(parsed.path)).resolve()
                  if parsed.path else file.resolve())
        assert target.exists(), (file, link)
        if parsed.fragment and target.suffix == '.md' and target.is_relative_to(root):
            headings = re.findall(r'^#{1,6}\s+(.+?)\s*#*$', target.read_text(), re.M)
            slugs = []
            for heading in headings:
                heading = re.sub(r'\[([^\]]+)\]\([^)]+\)', r'\1', heading)
                slug = ''.join(c for c in heading.lower()
                               if c in '-_ ' or unicodedata.category(c)[0] in 'LN').replace(' ', '-')
                unique, n = slug, 0
                while unique in slugs:
                    n += 1
                    unique = f'{slug}-{n}'
                slugs.append(unique)
            assert urllib.parse.unquote(parsed.fragment) in slugs, (file, link)
        count += 1
print(f'PASS: {count} local links; seven phase sections; unique ADR IDs; whitespace/casing')
PY

Manual sign-off also requires matching file manifest, scope/secret review, honest scanner/E2E limitations, relevant ADRs and explicit Git status. If a required audit/check cannot run, record blocked—not successful. This research experiment's verification does not close G0 or any production gate.

Verification record:

  • Documents, phase/ADR structure and links/anchors validated.
  • Application/probe/config/pin integrity and document whitespace pass.
  • Official account-policy permission distinguished from adapter support; no account/credential effects; authorized user-level rootless lab installed; no Loom application change, invented reviewer sign-off or false G0 closure.
  • Rootless lab CPU/memory/PID limits observed; SIGTERM-ignoring container stopped with no surviving process or heartbeat writes; 2 GiB workspace cap ENOSPC-tested; tmpfs capped; rootful daemon/default context preserved; rollback path recorded.

Baseline from governance (2026-10-21): lint/typecheck passed; 3 tests passed, 100% functions / 90.99% instrumented lines; audit found no advisories across 14 packages. Skill/recovery evidence and accepted runtime were committed at 5ae0737; the G0 pack is at 558610f. Current docs-and-lab verification (2026-10-22):

Command / review Result Limit
SPEC's document validator, new-report/pack whitespace and git diff --check Exit 0: 247 local links; seven phase sections; 12 unique acceptance IDs; unique ADR IDs; whitespace/casing pass No full Markdown lint or future external availability claim.
Declared git diff --exit-code for application/probe/config/pin integrity Exit 0; no changes Earlier executable results not relabelled as fresh; application checks N/A for docs-and-lab delta.
Six-file scope/source/evidence/authority/secret review Official report reconciled with static Pi source; critical Google terms, SIWC inference and OpenAI data-control requirements independently fetched; model availability is owner-attested; no credentials or live effects No independent account verification, opt-out confirmation, legal approval, live integration or automated secret-scan pass claimed. Prior commits 67a94fc/98a6975/7caac84/22fbd43; this workspace-cap delta included in the authorized commit; G0 open.
Rootless lab setup and resource controls User-level Docker 29.9.2 (rootless, overlayfs, cgroup systemd); CPU throttle 20/21, memory OOM exit 137, PID fork denial at 16; SIGTERM-ignoring container exited 137 under stop -t 1 with no heartbeat writes; 2 GiB ext4 workspace hit ENOSPC at 1.9 GiB; 64 MiB tmpfs cap; rootful default preserved Lab host only; workspace mount preflight/log caps/boot persistence, final image pin, linger, port publishing, broker and production host unqualified.
Local Codex data-control check Installed codex-cli 0.163.0; no settings/config command; features list lacks include_environments; user config has only UI/project/hook keys; local config/read reports include_environment_context=true; public harness source review found no account-control query Local CLI and public source only; account training opt-out and Codex Include environments remain owner attestations; no login, auth-cache read or prompt call.
Secret scanner Unavailable (gitleaks/trufflehog not on PATH) No automated secret-scan pass claimed; code/release phase requirements must be resolved before its closure.
Reviewer deployment opencode debug agents discovers ishan-reviewer; child session has only read/glob/grep and parallel wrapper; package.json read succeeded; shell tool absent and command not executed Tool-availability smoke, not an observed permission-denial response or OS sandbox test. First G0 report is advisory; Ishan disposition pending.
Reviewer package checks (2026-10-22) Loaded-profile last-match rule assertions: 16 synthetic allow/deny cases passed; inherited model confirmed; document validator: 251 links/seven sections/unique ADR IDs; seven-file whitespace and required report sections/SHA/pending disposition passed Synthetic policy evaluation plus actual restricted-tool discovery, not adversarial sandbox qualification. No sensitive test inputs read; application/typecheck/coverage/audit N/A to agent/docs-only scope.
Human disposition update (2026-10-22) Owner relayed Ishan's approval of the report for fc0e05e; provenance recorded; validator passed (251 links), eight-file whitespace/approval assertions and git diff --check passed; application/config/pin integrity unchanged No direct signature claimed; R-001 open, no finding waiver or G0/P1/live-use approval implied. Earlier pending-disposition entries above describe the initial report run.
G0 remediation preparation (2026-10-22) R-001 assertion first failed (exit 1), then passed after roadmap alignment to one hour; document validator exit 0 (253 links/seven sections/unique IDs); seven-file whitespace and account/disabled-provider/pending-phase assertions passed Original approved report unchanged. Tier preference/data controls are owner-attested; no live qualification or application/host change. First T-01 slice and later proof ownership are proposed in closure packet; corrected artifact needs follow-up/human disposition.
T-01 scope approval record (2026-10-22) Owner stated “T-01 approved”; document validator passed (254 links/seven sections/unique IDs), six-file whitespace and scope/authority assertions passed; git diff --check passed; code/config/pins/reports unchanged Approval metadata only; earlier candidate/report snapshots preserved. G0 package acceptance and phase start remain separate; no application tests applicable or implementation performed.
G0 acceptance record (2026-10-23) Owner stated “G0 accepted”; document validator exit 0 (254 links/seven sections/unique IDs), six-file whitespace/date/acceptance/authority assertions and git diff --check passed; code/config/pins/reports unchanged G0 closed as design/feasibility gate. Existing linked heading retained after validator caught an anchor break. No application tests applicable, no P1 implementation or live/production qualification performed; later gates remain mandatory.