Fix touch event handling, improve reliability, and optimize performance #16048
Azure Pipelines / PR
succeeded
Apr 24, 2026 in 1h 15m 22s
Build #RNW_0.0.0-canary.1053.pr630436 succeeded
Details
- Failed: 0 (0.00%)
- Passed: 7,438 (99.84%)
- Other: 12 (0.16%)
- Total: 7,450
Loading